My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-14 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2019
>
2019-08-14 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2019 7:20:26 AM
Creation date
8/12/2019 7:20:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEASIBILITY STUDY <br />8.0COST ESTIMATES/FUNDING <br />Below is a summary of the estimated project costs for the improvements discussed in this <br />report. Detailed cost estimates have been prepared for all improvements identified in the <br />previous sections. These estimates can be found in Appendix A. <br />TABLE 3 - SUMMARY OF ESTIMATED COSTS <br />TypeScopeTotal CostFunding Source <br />Street Fund/ <br />Street ImprovementsTotal Street Costs$1,585,940 <br />Bonds**/Assessments <br />Water MainTotal Water System Costs$494,053Grant/Water Fund <br />Storm SewerTotal Sewer System Costs$341,415Storm Sewer Fund <br />Total Potential Costs$2,421,407 <br />*Based on open cut installation of water main in conjunction with full street reconstruction. <br />**Only if needed. <br /> City of Centerville <br /> 2020 Downtown Street and Utility Improvement Project <br />Project No.: 193804758 10 <br />30 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.