Laserfiche WebLink
FEASIBILITY STUDY <br />8.0COST ESTIMATES/FUNDING <br />Below is a summary of the estimated project costs for the improvements discussed in this <br />report. Detailed cost estimates have been prepared for all improvements identified in the <br />previous sections. These estimates can be found in Appendix A. <br />TABLE 3 - SUMMARY OF ESTIMATED COSTS <br />TypeScopeTotal CostFunding Source <br />Street Fund/ <br />Street ImprovementsTotal Street Costs$1,585,940 <br />Bonds**/Assessments <br />Water MainTotal Water System Costs$494,053Grant/Water Fund <br />Storm SewerTotal Sewer System Costs$341,415Storm Sewer Fund <br />Total Potential Costs$2,421,407 <br />*Based on open cut installation of water main in conjunction with full street reconstruction. <br />**Only if needed. <br /> City of Centerville <br /> 2020 Downtown Street and Utility Improvement Project <br />Project No.: 193804758 10 <br />30 <br /> <br />