My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-11 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2019
>
2019-09-11 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2019 10:00:26 AM
Creation date
9/6/2019 3:40:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec Consulting Services Inc. <br />733 Marquette Avenue Suite 1000, Minneapolis MN 55402-2309 <br />September 4, 2019 <br />File: 193804758 <br />Attention: Mr. Mark Statz, City Administrator/Engineer <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038 <br />Reference: Proposal for Engineering Design Services – Downtown Street and Utility Reconstruction <br />Project <br /> Dear Mark, <br />This letter outlines the Scope of Services and estimated costs for providing engineering design services for <br />Centerville’s proposed downtown street and utility reconstruction project (the Project). The streets included <br />in the project include 2-1/2 blocks of Sorel Street, Goiffon Road, Progress Road south of Main Street, one <br />block of Centerville Road north of Main Street, Heritage Street east of Centerville Road. See the attached <br />map of the proposed project area. The improvements will generally include full reconstruction of the road <br />with the addition of curb and gutter, storm sewer improvements, and the addition of water main and water <br />service to the existing residences that are currently served by private wells. The City has received a grant <br />to extend water service to income-qualified residents in the project area. <br />The design for this project would consist of the following tasks in accordance with Stantec’s Professional <br />Services Agreement with the City of Centerville: <br />Engineering Phase: <br />Task 1 – Design of street and pedestrian facilities with parameters as proposed in the feasibility study. <br />Task 2 – Design of water main and water services with parameters as proposed in the feasibility study. <br />Task 3 – Analysis of stormwater management and permitting requirements, and design of storm water <br />conveyance system within project area. Design of stormwater management systems such as off- <br />site irrigation is not included in this scope. <br />Task 4 – Attendance at one Council Meeting to present plans and receive authorization to advertise for <br />bids. <br />Task 5 – Preparation of bidding documents to include plans, specifications, and Advertisement for Bids. <br />Documents to conform with bidding requirements set forth by funding agencies. <br />Task 6 – Assistance during bidding including answering contractor questions, preparing Addenda as <br />necessary, and attendance at bid opening. <br />74 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.