My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-08 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2024
>
2020
>
2020-01-08 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 2:27:34 PM
Creation date
1/6/2020 2:27:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 5, 2019 <br />Mr. Mark Statz, City Administrator/Engineer <br />Page 2 of 3 <br />each area, estimate the irrigation area and volume and the acres of RCWD mitigation credits. Prepare a <br />table summarizing the analysis and results. Submit results to City staff and follow up with a call to review. <br />seven areas identified by the City (see attached Figure 1). The layout and design of the system will <br />primarily be completed by the contractor. Stantec will provide information for pump and control <br />modifications as needed, installation of a flow meter, and specifications of the irrigation system. <br />It is assumed that this will entail expanding an existing permit rather than completion of a new permit <br />application. It is further assumed that any RCWD permit application, review, and approval would be <br />included with the downtown street improvement project or future downtown redevelopment. <br />bidding process, attending the bid opening, preparing the Bid Tabulation and associated letter for City <br />Council for consideration of project award, and attending one Council meeting to discuss bid results. <br />preconstruction meeting, review of shop drawings and submittals, contract administration, preparation of <br />record plans, and 20 hours of time to perform on-site project observation. <br />Schedule <br />A proposed schedule for this project is as follows: <br />December 11, 2019Authorization to begin work <br />January 2020Project meeting with City staff <br />February 2020City Council approves plans; authorizes bidding <br />March 2020Receive Bids/Consider Award <br />Compensation <br />The work will be performed on an hourly basis with an estimated fee of $29,400 including expenses. This <br />fee is not-to-exceed without prior authorization. This scope and fee assume that the <br />design/bidding/construction process will commence from start to finish with no interruption of engineering <br />services, and that all identified irrigation areas be constructed under the same contract. <br />This letter and scope of services represents the understanding between the City and Stantec in respect to <br />the Project and may only be modified in writing signed by both of us and is subject to the current Master <br />Services Agreement between the City and Stantec. <br />48 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.