Laserfiche WebLink
<br />Anoka County Contract No.2006-0558 <br /> <br />3. The City shall furnish and deliver to the construction site replacement <br />hydrants for any hydrants, which are being relocated as a part of this project, which th want <br />replaced. <br /> <br /> <br />4. The City shall provide construction observation for th <br />reconstruction of their utilities and approve for acceptance the work as it is co <br /> <br />4a. The City shall be responsible for any deficienc' <br />relocation and reconstruction of the utilities that ar' <br />completion of the Project. <br /> <br />5. The City shall pay one hundre <br />and non-eligible portion of the storm sewer const <br />of storm sewer construction. Storm sewer const <br />basins, manholes, castings, rip rap, inlet protec <br />outlet structures and grit chambers and/or coIl <br />eligible and eligible portions are defined in the <br /> <br />articipating <br />ible portion <br />ards, catch <br />s and their <br />. The non- <br /> <br />and County <br />ontributing <br />g flow from <br /> <br />torm sewer is $0.00 of which <br /> <br />~) of the cost of concrete curb and <br />lIe. estimated total cost of curb and gutter <br />ity's estimated cost is $115,222.00. <br /> <br />median a <br />$0.00. <br /> <br />undred percent (100%) of the cost of decorative <br />he City's estimated cost for decorative median is <br /> <br />items inc <br />concrete <br />streetsca <br />Highway <br />streetsca <br /> <br />hall pay one hundred percent (100%) of the cost of streetscape <br />to: median plantings, trees, tree grates, street lights, stamped <br />treatments the City chooses to include with the Project. The <br />be signed by a licensed landscape architect and meet the Anoka County <br />t Landscape/Streetscape Guidelines. The City's estimated cost for <br />500,000.00. <br /> <br />3 <br /> <br />~3 <br />