Laserfiche WebLink
<br />Anoka County Contract No.2006-0558 <br /> <br />9. The City shall pay one hundred percent (100%) of the cost of new <br />concrete and/or bituminous driveway pavement for all upgraded driveways. The City's e imated <br />cost for driveway pavement is $6,345.00. <br /> <br />13. The City shall pay one h <br />bituminous trails. This cost includes pavem <br />lightweight fill and geotextile fabric if applicabl <br />construct the trail as well as any retaining wall <br />would not be required without the trail. The Ci <br /> <br /> <br />10. Any in place driveway pavement disrupted by the con <br />replaced in-kind by the County at no cost to the City. <br /> <br />ill be <br /> <br />11. The City shall pay for one hundred percent (1 <br />sidewalk installed on the project including pedestrian curb ramps <br />City's estimated cost for new sidewalk is $97,617.25. <br /> <br />12. <br /> <br />In place concrete walk will be replac <br /> <br />cost to the <br /> <br />City. <br /> <br />st of new <br />(including <br />ecessary to <br />he trail that <br />77.50. <br /> <br />14. The City s <br />lighting included in the projec <br />accordance with the Coun <br />0.00. <br /> <br />f any street <br />shall be in <br />ighting is $ <br /> <br />15. <br />City shall pay <br />actuated sig <br /> <br />t (100%) of all interconnect <br /> <br />costs. <br /> <br />c (100%) of Emergency Vehicle <br />Pis $0.00. (Not in cost estimate at <br /> <br />determin <br /> <br />ir share of mobilization and field office as <br />ost of these items is $85,800.00 <br /> <br />The City' <br /> <br />ir share of traffic control as determined by Mn/DOT. <br />IS $11,400.00 <br /> <br />estimated construction cost to the City for the project IS <br /> <br />summanz <br /> <br />1 <br />2 <br />3 <br />4 <br /> <br />djustment of Local Utilities <br />d Bituminous <br /> <br />$397,050.00 <br />$0.00 <br />$547,140.72 <br />$0.00 <br /> <br />4 <br /> <br /><gLt <br />