Laserfiche WebLink
Stantec Consulting Services Inc. <br />733 Marquette Avenue Suite 1000,Minneapolis MN 55402-2309 <br />March 5, 2020 <br />File: 193804758 <br />Attention: Mr. Mark Statz, City Administrator/Engineer <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038 <br />Reference: Estimated Fees for Construction Services Î 2020 Downtown Street and Utility <br />Reconstruction Project <br /> Dear Mark, <br />This letter outlines the Scope of Services and estimated costs for providing construction and survey <br />streets included in the project include 2-1/2 blocks of Sorel Street, Goiffon Road, Progress Road south of <br />Main Street, one block of Centerville Road north of Main Street, Heritage Street east of Centerville Road. <br />See the attached map of the proposed project area. The improvements will generally include full <br />reconstruction of the road with the addition of curb and gutter, storm sewer improvements, and the addition <br />of water main and water service to the existing residences that are currently served by private wells. The <br />City has received a grant to extend water service to income-qualified residents in the project area. <br />The City authorized Stantec to prepare the plans and specifications in September, 2019. Bids were opened <br />on January 14, 2019, and the Final Assessment Hearing was held on February 26, 2020. The Council also <br />awarded to the Contract to A-1 Excavating, Inc. on February 26. <br />Professional Services Agreement with the City of Centerville: <br />Construction Phase: <br />drawings and contractor submittals, full-time on-site inspection, resident communication, erosion <br />control inspections, attendance at weekly construction meetings, and contract <br />management/preparation and processing of pay requests. <br /> <br />