My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-04-08 CC WS & Council Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2020
>
2020-04-08 CC WS & Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 6:36:18 PM
Creation date
4/3/2020 6:35:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Trail Plan Documents, Sketch and Description, prepared by EG Rud & Sons, Inc., <br />05/01/2019. <br />E. Trail Easement, Anoka County Recorder, document ID 4225917 prepared by EG <br />Rud & Sons, Inc. dated 05/01/2019. <br />F. e improvements constructed pursuant to <br />this Agreement. <br />These Plans may include subsequent plan revisions approved, in writing, by the City Engineer. <br /> 7. PUBLIC AND PRIVATE IMPROVEMENTS. The Developer shall install and <br />These Improvements are detailed in Exhibit D. <br /> All Improvements shall be installed in acco <br />City standard specifications for utilities and street construction; and any other applicable law, <br />ordinance or policy. The Developer shall submit plans and specifications for the Improvements <br />that have been prepared by a competent registered professional civil engineer to the City for <br />approval by the City Council. The Developer shall obtain all necessary permits from other <br />agencies before proceeding with construction of the Improvements. The Developer, at its sole <br />expense, shall instruct its engineer to provide adequate field inspection personnel to assure an <br />certify, as a condition of City acceptance, that the construction work for the Improvements meet <br />the approved City standards. <br /> The Developer, its contractors and subcontractors, shall follow all instructions received <br />from the City and Rice Creek Watershed inspectors, so long as consistent with the Plans. The <br />ovide for on-site project management. The Developer or its <br />engineer shall schedule a pre-construction meeting at a mutually agreeable time and location <br />with all parties concerned, including the City Engineer, inspector and/or consultants, to review <br />the program for the construction work. Prior to the pre-construction meeting, Developer shall <br />Version 3/30/3030 - 1 Page 5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.