My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-13 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2020
>
2020-05-13 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2020 5:37:23 AM
Creation date
5/10/2020 5:36:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 8, 2020 <br />Mr. Mark Statz, City Administrator/Engineer <br />Page 3 of 4 <br />Schedule <br />A proposed schedule for this project is as follows. <br />May 14, 2020Authorization to begin work <br />Week of May 18 or May 25th On site walk thru and meeting with City staff and LAD. <br />June 10, 2020City Council approves plans; authorizes bidding <br />July, 2020Receive Bids and Consider Award <br />Compensation <br />The work will be performed on an hourly basis with an estimated of $11,900 for design and $5,700 for <br />construction administration. This $17,600 fee is not-to-exceed without prior authorization. This scope and <br />fee assume that the design/bidding/construction process will commence from start to finish with no <br />interruption of engineering services. <br />This letter and scope of services represents the understanding between the City and Stantec in respect to <br />the Project and may only be modified in writing signed by both of us and is subject to the current Master <br />Services Agreement between the City and Stantec. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.