My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-13 Report
Centerville
>
City Council
>
City Administrator Weekly Updates
>
2018-2022
>
2020
>
2020-05-13 Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 9:39:49 AM
Creation date
5/15/2020 9:39:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />LaMotte Park Stormwater Reuse System Expansion <br />Staff is recommending award of the contract for the LaMotte Park Stromwater Reuse System <br />Expansion on this agenda. Also, on this City Council agenda is the agreement with St. Paul <br />Regional Water Service, allowing the portion of the project to be constructed on their <br />property. <br /> <br />Staff is actively negotiating agreements with St. Genevieve’s Church, and the Met <br />Council to allow the placement of the irrigation system on their respective properties. <br />The contract award will be made in such a way as to leave the construction of facilities on <br />St. Genevieve’s property and Met Council property contingent upon execution of <br />agreements with the final two parties. <br /> <br />SEWER AND WATER <br /> <br />Wellhead Protection Plan <br />City staff have reviewed the draft of Part 2 of the City’s Wellhead Protection Plan, as put <br />together by our consultants. Once our comments have been incorporated, we will submit <br />the plan to surrounding jurisdictions for review. A few highlights of the plan include future <br />projects such as sealing abandoned wells and fixing or lining leaking sewer mains and <br />services within the Emergency Response Area (ERA), which is the area closest to the city’s <br />well. <br /> <br />Watermain Interconnect <br />The new meter has been installed and we are waiting on the SCADA connection. <br /> <br />2020 Downtown Street and Utility Improvements <br />CenterPoint Energy has informed us of their intent to finish their replacement of the old <br />gas main in the downtown area by making the switch to the recently installed new main. <br />They will be seeking voluntary entrance into homes to relight pilot lights on appliances. <br />If they are able to gain access to all homes in a particular area, they will be able to <br />abandon the old main in that neighborhood. This would let our contractor in to finish <br />construction of the water main, storm sewer and roads. <br /> <br />Rice Creek Chain of Lakes Park Reserve Maintenance Facility Sewer Hook-up <br />With the city’s comprehensive plan now approved, the Met Council was now able to <br />approve the sewer extension permit for this project. The city has issued the permit and <br />construction can now be completed. <br /> <br />PARKS AND RECREATION <br /> <br />Facebook Comment: <br />Murray Wilke - I really have appreciated the city trails on the south side of town. A great <br />resource for daily walks during “stay at home” era <br />Fete des Lacs <br />The Fete des Lacs Committee made the difficult decision at their meeting on May 6, to cancel <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.