Laserfiche WebLink
Q50 Enter the number of site inspections conducted for sites an acre or greater between January 1, <br />2019, and December 31, 2019: <br />Q51 Enter the frequency at which site inspections are conducted (e.g. daily, weekly, monthly): [Part <br />III.D.4.d.(2)]: <br />weekly <br />Q52 <br />Q53 <br />Q54 <br />Q55 <br />Enter the number of trained inspectors that were available for construction site inspections <br />between January 1, 2019, and December 31, 2019: <br />Provide the contact information for the inspector(s) and/or organization that conducts construction <br />stormwater inspections for your MS4. List your primary construction stormwater contact first if you <br />have multiple inspectors. <br />1 Inspector name: Stantec Engineering <br />Organization: Stantec Engineering <br />Office phone: 651-775-5154 <br />Work/Cell phone: <br />Email address: <br />Preferred contact <br />method: <br />2 Inspector name: <br />Organization: <br />Office phone: <br />Work/Cell phone: <br />Email address: <br />Preferred contact <br />method: <br />3 Inspector name: <br />Organization: <br />Office phone: <br />Work/Cell phone: <br />Email address: <br />Preferred contact <br />method: <br />What traininn dirt insnartnrs rprpivp? <br />Q54 Options <br />Q54 — your answers <br />Q54:1 University of Minnesota Erosion and <br />Stormwater Management Certification Program <br />Q54:2 Qualified Compliance Inspector of <br />Stormwater(QC IS <br />Q54:3 Minnesota Laborers Training Center <br />Stormwater Pollution Prevention Plan Installer <br />or Supervisor <br />Q54:4 Minnesota Utility Contractors Association <br />Erosion Control Training <br />Q54:5 Certified Professional in Erosion and <br />Sediment Control CPESC <br />Q54:6 Certified Professional in Stormwater <br />Quality CPSWQ <br />Q54:7 Certified Erosion, Sediment and Storm <br />Water Inspector CESSWI <br />Q54:8 Other <br />Other <br />If "Other," describe: <br />Stantec <br />Between January 1, 2019, and December 31, 2019, did you modify your BMPs, measurable goals, <br />or future plans for your construction site stormwater runoff control program? [Part IV.B.] <br />If "Yes," describe those modifications: <br />2 <br />1 <br />No <br />https://www.pca.state.mn.us 651-296-6300 800-657-3864 Use your preferred relay service Available in alternative formats <br />wq-strm4-06 • 213120 Page 6 of 9 <br />