<br />Anoka County Contract No.2006-0558
<br />
<br />3. The City shall furnish and deliver to the construction site replacement
<br />hydrants for any hydrants, which are being relocated as a part of this project, which they want
<br />replaced. .
<br />
<br />4. The City shall provide construction observation for the relocation and
<br />reconstruction of their utilities and approve for acceptance the work as it is completed.
<br />
<br />4a. The City shall be responsible for any deficiencies associated with the
<br />relocation and reconstruction of the utilities that arise ciuring or after the
<br />completion of the Project.
<br />
<br />5. The City shall pay one hundr~ perce#t(IOO%) for the non-participating
<br />and non-eligible portion of the storm sewer constf\1<:tion plusa~centage of the eligible portion
<br />of storm sewer construction. Storm sewer constnictic;m includes pipes, aprons, trash guards, catch
<br />basins, manholes, castings, rip rap, inlet protecti<>:Il,detentionba~~ (including ponds and their
<br />outlet structures and grit chambers and/or collt:(;tprs), and IIp<.>rtion.of mobilization The non-
<br />eligible and eligible portions are defmed in the State Hydraulics letter:
<br />
<br />. ',.'.c.,.,_, '.....,.-._. ....
<br />
<br />..5g,. ." '.' The t()'al' non-eligible ~iJnat~cost ofthe' storm sewer is $0.00 of which
<br />the estimateci cost to the City is $0.00 (100010).
<br />
<br />.;.....:",'. \.:.'.".:.::;-_.~.',.d. '''-'.: _..".'. ".::".'.~-...:_.;".'..' -'..: ,.:.'."...... .,-.:;...'..'......' ,_.'.'.'..:,.'.',.. ._._.,,'.'::. " "'. ' ::.:';. ..
<br />
<br />.\:.~,:/iJhe9it)r..~llllJ)ay f~Pe,r~!1t<~O%)l:lf the cost of concrete curb and
<br />gutter (less{lle<li~n curb an~gutter) in CenteIVille. The estUnllted total cost of curb and gutter
<br />including rpedians is $281,114.00, of which the City's estimated cost is $115,222.00.
<br />
<br />.......:........"".... '..".._........i:....,-"'.:......:...._'._:.'.......'..c'.":.'.'.,.....
<br />.. .-,' :'. ,': ",".." ':' ,'. :: .. ,:,. .." ...... .. .,:.. ..",,',..... .,' :': ,::':',"r::'>"~: ::';:"
<br />7. ..:The Sity:sl1~llpay o~~ hUlldred percent (100%) of the cost of decorative
<br />median abo"e'the <:ost of concrete median The City's estimated cost for decorative median is
<br />$0.00. ~';";)
<br />:,--:': ','/':"---:-' "',--:".:>. ;;:.,::'/'
<br />
<br />.. .... 8. .Jhe~it)' shaITpay. o~~~undred percent (100%) of the cost of streetscape
<br />items incIudiI1g buttl()t liini!ed to:me4i~ plantings, trees, tree grates, street lights, stamped
<br />concrete and other aesthetiy treatments the City chooses to include with the Project. The
<br />streetscape items shall be designed by a licensed landscape architect and meet the Anoka County
<br />Highway Department Landscape/Streetscape Guidelines. The City's estimated cost for
<br />streetscape items is $500,000.00.
<br />
<br />9. The City shall pay one hundred percent (100%) of the cost of new
<br />concrete and/or bituminous driveway pavement for all upgraded driveways. The City's estimated
<br />cost for driveway pavement is $6,345.00.
<br />
<br />..' to. Any in place driveway pavement disrupted by the construction will be
<br />replaced in-kind by the County at no cost to the City.
<br />
<br />3
<br />
<br />Deleted: split between the Cit,y and
<br />
<br />Deleted: County based on the ratio of
<br />contributing flow detennined by the
<br />product of contributing area and nmoff
<br />coefficient. The estimated percentage of
<br />contnbuting flow from the Cit,y is Thirty
<br />Eight percent (38%). The tomI eligible
<br />estimated cost of the storm sewer is
<br />$1.439,844.00 of which the estimated
<br />cost to the Cit,y is $547, 14Q 72.
<br />
<br />/tJ/
<br />
|