Laserfiche WebLink
<br />Anoka County Contract No.2006-0558 <br /> <br />3. The City shall furnish and deliver to the construction site replacement <br />hydrants for any hydrants, which are being relocated as a part of this project, which they want <br />replaced. . <br /> <br />4. The City shall provide construction observation for the relocation and <br />reconstruction of their utilities and approve for acceptance the work as it is completed. <br /> <br />4a. The City shall be responsible for any deficiencies associated with the <br />relocation and reconstruction of the utilities that arise ciuring or after the <br />completion of the Project. <br /> <br />5. The City shall pay one hundr~ perce#t(IOO%) for the non-participating <br />and non-eligible portion of the storm sewer constf\1<:tion plusa~centage of the eligible portion <br />of storm sewer construction. Storm sewer constnictic;m includes pipes, aprons, trash guards, catch <br />basins, manholes, castings, rip rap, inlet protecti<>:Il,detentionba~~ (including ponds and their <br />outlet structures and grit chambers and/or collt:(;tprs), and IIp<.>rtion.of mobilization The non- <br />eligible and eligible portions are defmed in the State Hydraulics letter: <br /> <br />. ',.'.c.,.,_, '.....,.-._. .... <br /> <br />..5g,. ." '.' The t()'al' non-eligible ~iJnat~cost ofthe' storm sewer is $0.00 of which <br />the estimateci cost to the City is $0.00 (100010). <br /> <br />.;.....:",'. \.:.'.".:.::;-_.~.',.d. '''-'.: _..".'. ".::".'.~-...:_.;".'..' -'..: ,.:.'."...... .,-.:;...'..'......' ,_.'.'.'..:,.'.',.. ._._.,,'.'::. " "'. ' ::.:';. .. <br /> <br />.\:.~,:/iJhe9it)r..~llllJ)ay f~Pe,r~!1t<~O%)l:lf the cost of concrete curb and <br />gutter (less{lle<li~n curb an~gutter) in CenteIVille. The estUnllted total cost of curb and gutter <br />including rpedians is $281,114.00, of which the City's estimated cost is $115,222.00. <br /> <br />.......:........"".... '..".._........i:....,-"'.:......:...._'._:.'.......'..c'.":.'.'.,..... <br />.. .-,' :'. ,': ",".." ':' ,'. :: .. ,:,. .." ...... .. .,:.. ..",,',..... .,' :': ,::':',"r::'>"~: ::';:" <br />7. ..:The Sity:sl1~llpay o~~ hUlldred percent (100%) of the cost of decorative <br />median abo"e'the <:ost of concrete median The City's estimated cost for decorative median is <br />$0.00. ~';";) <br />:,--:': ','/':"---:-' "',--:".:>. ;;:.,::'/' <br /> <br />.. .... 8. .Jhe~it)' shaITpay. o~~~undred percent (100%) of the cost of streetscape <br />items incIudiI1g buttl()t liini!ed to:me4i~ plantings, trees, tree grates, street lights, stamped <br />concrete and other aesthetiy treatments the City chooses to include with the Project. The <br />streetscape items shall be designed by a licensed landscape architect and meet the Anoka County <br />Highway Department Landscape/Streetscape Guidelines. The City's estimated cost for <br />streetscape items is $500,000.00. <br /> <br />9. The City shall pay one hundred percent (100%) of the cost of new <br />concrete and/or bituminous driveway pavement for all upgraded driveways. The City's estimated <br />cost for driveway pavement is $6,345.00. <br /> <br />..' to. Any in place driveway pavement disrupted by the construction will be <br />replaced in-kind by the County at no cost to the City. <br /> <br />3 <br /> <br />Deleted: split between the Cit,y and <br /> <br />Deleted: County based on the ratio of <br />contributing flow detennined by the <br />product of contributing area and nmoff <br />coefficient. The estimated percentage of <br />contnbuting flow from the Cit,y is Thirty <br />Eight percent (38%). The tomI eligible <br />estimated cost of the storm sewer is <br />$1.439,844.00 of which the estimated <br />cost to the Cit,y is $547, 14Q 72. <br /> <br />/tJ/ <br />