Laserfiche WebLink
<br />Anoka County Contract No.2006-0558 <br /> <br />11. The City shall pay for one hundred percent (100%) of the cost of new <br />sidewalk installed on the project including pedestrian curb ramps with truncated domes. The <br />City's estimated cost for new sidewalk is $97,617.25. <br /> <br />12. <br /> <br />In place concrete walk will be replaced by the County <br /> <br /> <br />to the <br /> <br />City. <br /> <br />The City shall pay one hundred percent (100%) of the cost of new bituminqus trails. This cost <br />includes pavement, aggregate base, soil correction (including lightweightfill and geotextile <br />fabric if applicable) and additional embankment work necessary t()8()~~~tthe trail as well as <br />any retaining walls and fences that are required due to the trail that\V~l1.lq not be required <br />without the trail. The City's estimated cost for the trail is $484,7n.5.R.Purstiant toit~ earlier <br />agreement Anoka County will applv for funds through the Metro rarksTrail Program fo~ possible <br />reimbursement to the City after construction. Anoka County agrees to place this reimbursement among <br />the County's list of priorities for funding in the first biennium of the capital improvement plan to be <br />funded from the Metropolitan Regional Parks Capital Improvements Program. County staff will do <br />everything within its power to secure such funding including pUfsuirllispecial appropriations from the <br />legislature ifthat appears feasible. <br />13. <br /> <br />14. The City shall pay one hundred. percent (10001) of the cost of any street <br />lighting included in the project. The design and installation of{)Wamental streetlights shall be in <br />accordance with the County's.sPecifications. The City's estimated cost for street lighting is $ <br />0.00. . <br /> <br />15. ... As th~City of Centerville has a population of less than 5000 people, the <br />City shall pay zero percent(O<Jio) of the cost of construction an<l. installation of the whole traffic <br />actuated signal system at CSAH 54 (including County supplied materials). <br /> <br />16. The County shall pay one hundred percent (100%) of all interconnect <br /> <br />costs. <br /> <br />\.< 17. > The 9t}t shaJlpay one hundred percent (100%) of Emergency Vehicle <br />Pre-emption (EVP)costs. The City's estimated cost for EVP is $0.00. (Not in cost estimate at <br />this time) <br /> <br />.Y .... 18.' The' fQ~!L~~~lLr~1___~!L~~~_~h~LIE~~tl_~~~tc.>~u~_I!~J!~)_4uQ.ffl~~~__~~U_------ <br />indicated in MOD. <br /> <br />19. <br /> <br />Deleted: City shall pay their share of <br />mobilization and field office as <br />detennined by MnIDOT. The City's <br />estimated cost of these items is <br />County shall pay all costs of traffic control as indicated in MOU~____um_______ $85,800.00 <br />Deleted: City shall pay their share of <br />traffic control as determined by MnlDOT. <br />The City's estimated cost of these items <br />is $11,400.00 <br /> <br />20. <br />summarized below: <br /> <br />The total estimated construction cost to the City for the project is <br /> <br />1 Construction and Adjustment of Local Utilities <br />2 Grading, Base and Bituminous <br />3 StormSe'Ver <br />4 Detenti?n Basins (included in Storm Sewer) <br />5 Concrete Curb & Gutter <br /> <br />$397,050.00 <br />$0.00 <br />$,.;:Q;n__n__ _Uh__m_ _ __ _ _ _ U __ __ _ m__ __u m_ _ _ _------{ Deleted: 547,140.72 <br />$0.00 <br />$115,222.00 <br /> <br />4 <br /> <br />/JL <br />