Laserfiche WebLink
<br />MEMO <br /> <br />\)rPA~ ~ <br />~Jtr <br />d-CJo~ W <br />:;.(:P~ <br />v/'-ce~' ~~ <br />S)) ~ ---~~ \. 0 ~ Js- <br />-\ >(l~r- . <br />\.)~ 'V. ,-c-V" ~ <br />~ <br /> <br />'2;;. ? cJ() <br />~ \ SOD <br />5~. <br />..---: . J~ U <br />'\0-' I.. <br /> <br />Date: <br /> <br />10 July 2006 <br /> <br />To: <br /> <br />Dallas Larson, City Administrator <br />Paul Palzer, Public Works Director/Building Official ~ <br /> <br />From: <br /> <br />Re: Snowplow Replacement <br />+111 1 1+++++++++++++++++++++++++++++++++++++++++++++++++++++++++ <br /> <br />I have received quotes through the state's vendor bid system for the replacement of the <br />1985 Ford plow and sander unit. The new truck would be a 2006 Sterling, similar to our <br />2001, but with many new updates, The plow, box and lighting n'ould be an enbaaced <br />system including a belly scraper, an elliptical box and a new LED lighting system, <br />eliminating the blinding effect of the current strobe system on the driveL Other upgrades <br />include a rear mounted wing plow verses a front mounted wing, relocation of the <br />hydraulic valve bank in a seal exterior box with the hydraulic tank mounted in front of <br />the box above the frame, The electronic controls of the sander will automatical\'j '.:.top <br />sanding when the truck comes to a stop, An aluminum fuel tank instead of steel and an <br />LED strobe on the end of the wing plow. <br /> <br />Both the new truck and components are much more user friendly and more reliable for <br />extended life of the vehicle. The total costs are below and the cost to replace tms same <br />truck in 2007 will be $18,000.00 - $20,000.00 due to the new pollution control devices on <br />the truck and a scheduled 15% increase for all ofthe body and plow components form J- <br />Craft. The other issue is that 2007 vehicles will only be able to run on new fuel, which is <br />not yet available, and will have higher maintenance costs associated with the new <br />pollution exhaust system. <br /> <br />r would recommend to that the Council approve the purchase of the new truck and <br />components as listed. The truck will take about 4 months for its build and the body, plow <br />and lighting another month. This would leave us with a deliver date in December if we <br />order by August 1 st. I would also like to cbange out the two front strobe lights on the <br />2001 Sterling with the new LED lights due to the blinding glare of the strobes in the <br />mirrors of the driver (usually they drive with them off now due to this issue). This would <br />add another $1,500.00 to the final cost. <br /> <br />The total cost of the new truck without tax or delivery is $116,565.00, of which $58,943- <br />is for the Sterling and $57,622.00 for the body, plow, sander and lighting components. <br />Total anticipated costs are about $120,000.00. The 2001 Sterling was about <br />$105,000.00. <br /> <br />53 <br />