My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-09-09 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2020
>
2020-09-09 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2020 6:03:45 AM
Creation date
9/8/2020 6:02:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Action 6B: Review locationand status of rain gardens within the DWSMA to <br />determine if they pose a threat to groundwater quality. <br />Who: City of CentervilleStaff <br />Cooperators: Watersheds, Neighboring Communities, Anoka County, Washington <br />County <br />When: Every two years or as needed <br />Cost: 10-40 hours per year <br />How:Review location and status of rain gardens. Determine if they pose a <br />potential threat to groundwater, based on their design and the <br />vulnerability of underlying groundwater resources. Seek grant funding <br />to remove or redesign rain gardens that may pose a threat. <br /> Status: Ongoing <br />Objective 7: Develop specific guidance for City Departments to use so that City staff can make <br />informed day-to-day decisions. <br />Action 7A: Review responsibilities of each department.Determine action triggers <br />that could affect wellhead protection activities for City of Centerville. <br />Establish means of educating City staff about wellhead protection <br />planning and the role they play in ensuring its successful <br />implementation. <br />Who: City ofCentervilleStaff <br />Cooperators: MDH <br />When: 2022 <br />Effort: 10 to 20 hours <br />How:Prepare specific guidance for each City department and educateCity <br />staff about its use. <br />Status: Currently prepared in outline form as part of this document. <br />Objective 8: Develop public education materials to enlist support of community in groundwater <br />management goals. <br />Action 8A: Use City’s website, brochures,newsletter, and/or social mediato enlist <br />public support for the Wellhead Protection Plan. <br />Who: City of Centerville Staff <br />Cooperators:MDH <br />When: Annually <br />Effort: 10-20 hours annually <br />How:Prepare educational materials for distribution using website, brochures, <br />newsletters, and consumer confidence reports. Vary educational <br />methods from year-to-year to ensure that the public is reached through <br />a variety of communication routes. <br />Status: Currently implemented. <br />23 <br />193803358 <br />Stantec Consulting Services, Inc. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.