My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-09-09 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2020
>
2020-09-09 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2020 6:03:45 AM
Creation date
9/8/2020 6:02:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.0 PROGRAM EVALUATION <br />Centervillewill evaluate the progress of the implementation plan every two years. The wellhead <br />protection plan manager will prepare a short progress report to be completed byDecember 31 of each <br />even-numbered calendar year, starting in the year 2022. The progress report will briefly discuss the <br />actions implemented by the City or any cooperators during the previous two years, and actions that <br />will be completed in the following two years. The progress report willbe distributed to the City <br />Council for their review after which it will be submitted to MDH. <br />According to Minnesota wellhead protection rules, this wellhead protection plan will be updated every <br />10 years from date of adoption or with the installation of any new municipal well to the water supply <br />system. <br />29 <br />193803358 <br />Stantec Consulting Services, Inc. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.