My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-09-23 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2020
>
2020-09-23 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 12:22:10 PM
Creation date
9/21/2020 12:22:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Owner: City of Centerville, 1880 Main Street, Centerville, MN 55038 <br />DateSeptember 18, 2020 <br />Contractor: Peterson Companies, Inc. 8326 Wyoming Trail, Chisago City, MN 55013 <br />Bond No: <br />Bond Co: <br />CHANGE ORDER NO. 1 <br />LAMOTTE PARK IRRIGATION EXPANSION <br />STANTEC PROJECT NO. 193804960 <br />Description of Work <br />This Change Order provides for the following: <br />Part A: Elimination of one large spray gun, and addition of one contractor-supply large spray gun and valve. <br />Part B: Installation of golf course-style heads on St. Genevieve's Church property in lieu of original small heads. Removal of MCES <br />Property from project. <br />Part C: Installation of flow sensor at well head with saddle and additional wiring. <br />Part D: Revisions to piping and wiring for SW Spray gun due to larger pipe size. <br />ContractUnitTotal <br />No.ItemUnitQuantityPriceAmount <br />CHANGE ORDER NO. 1 <br />PART A: SPRAY GUN REVISIONS <br />1REMOVAL OF 1 LARGE SPRAY GUN AND VALVELS1($4,500.00)($4,500.00) <br />FROM PROJECT <br />2CONTRACTOR-SUPPLIED LARGE SPRAY GUNLS1$4,675.00$4,675.00 <br />AND VALVE <br />TOTAL PART A: SPRAY GUN REVISIONS$175.00 <br />PART B: CHURCH IRRIGATION REVISIONS <br />3REVISED IRRIGATION ON CHURCH/MCESLS1$0.00$0.00 <br />PARCELS <br />TOTAL PART B: CHURCH IRRIGATION REVISIONS$0.00 <br />PART C: ADDITION OF FLOW SENSOR <br />4FLOW SENSOR AND ASSOCIATED WIRINGLS1$4,670.00$4,670.00 <br />TOTAL PART C: ADDITION OF FLOW SENSOR$4,670.00 <br />PART D: SW SPRAY GUN REVISIONS <br />5CREDIT FOR 3" PIPE AND 4" SADDLELS1($385.00)($385.00) <br />64" GATE VALVEEA1$720.48$720.48 <br />76" SADDLEEA1$616.00$616.00 <br />8ADDITIONAL PIPE SIZE AND LENGTHLS1$236.50$236.50 <br />9ADDITIONAL WIRINGLS1$176.00$176.00 <br />10ADDITIONAL LABORHR6$145.17$871.02 <br />TOTAL PART D: SW SPRAY GUN REVISIONS$2,235.00 <br />CHANGE ORDER NO. 1 SUMMARY <br />PART A: SPRAY GUN REVISIONS$175.00 <br />PART B: CHURCH IRRIGATION REVISIONS$0.00 <br />PART C: ADDITION OF FLOW SENSOR$4,670.00 <br />PART D: SW SPRAY GUN REVISIONS$2,235.00 <br />TOTAL CHANGE ORDER NO. 1$7,080.00 <br />193804960CHO1.xlsm <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.