Laserfiche WebLink
<br />Figure EA-2: Data Center with Four Halls Constructed <br />FuturePower <br />Substation <br />LoadingDock <br />Secure <br />Storage <br />AdminOffices <br /> <br />Observations <br />o In the graphic above, the components with the bright colored borders represent the <br />minimum equipment required for a 5kW per rack design. <br />o The components without the bright colored borders represent additional equipment that <br />would be required for a 10kW per rack load. <br />2020 MTC DCLM DC Model (1) Page 11 of 20 <br /> 2020 Excipio Consulting, LLC. All Rights Reserved. This document is proprietary and confidential and may not be duplicated, <br />redistributed, or displayed to any other party without the expressed written permission of Excipio Consulting LLC. <br /> <br />