Laserfiche WebLink
<br />Financial Estimates <br />5kW Model <br />This model uses an average designed kW per rack of 5kW but still maintains all of the attributes <br />in the Assumptions section on the previous page. The detailed calculations for each of the <br />summary charts below are included in the Appendix of this Document. <br />Figure EA-3: 5kW Model <br /> <br />Observations <br />o The chart lays out the CapEx and OpEx costs for constructing the facility at 1.6 MW (1 <br />data hall), 7 MW (4 data halls), and 17 MW (10 data halls). <br />o The design includes space for server build rooms and shared collaboration and <br />conference rooms for each data hall. <br />o The average build cost per rack is well under the market at $1,008 per rack, which allows <br />the buyer to achieve an ROI of 49% on the initial investment, including all annual OpEx <br />costs. <br />o The projected construction costs of this model are $14.91K per kW. <br /> <br /> <br />2020 MTC DCLM DC Model (1) Page 12 of 20 <br /> 2020 Excipio Consulting, LLC. All Rights Reserved. This document is proprietary and confidential and may not be duplicated, <br />redistributed, or displayed to any other party without the expressed written permission of Excipio Consulting LLC. <br /> <br />