<br />10kW Model Details <br />Analysis Calculations <br />Startup <br />Capital ComponentsRedundancyMetricUnit CostUnit SizeCalc Unit QtyOverride SizeOverride QtyCost <br />LandN/AAcre175,000$ 1.3220.003,500,000$ <br />Site WorkN/ASF10$ 19,20019,200192,000$ <br />Substructure - FoundationsN/ASF9$ 19,20019,200172,800$ <br />Shell - SuperstructureN/ASF21$ 19,20019,200403,200$ <br />Shell - Exterior SkinN/ASF22$ 19,20019,200422,400$ <br />Shell - RoofingN/ASF17$ 19,20019,200326,400$ <br />Interior BuildoutN/ASF300$ 19,20019,2005,760,000$ <br />Raised FloorN/ASF25$ 4,8004800120,000$ <br />Utility Power ConstructionNAkW150$ 3,4003400510,000$ <br />Racks & Power StripsN/ARack8,400$ 1281281,075,200$ <br />Distribution Switchgear2NkW1,000$ 5000A42,500410,000,000$ <br />Generators & ATSN+1kW800$ 1,60031,75034,200,000$ <br />UPS and batteriesN+1kW800$ 233850083,200,000$ <br />PDUs and Whips2NkW500$ 15027150322,400,000$ <br />Lightning protectionSF5$ 19,200119,200186,400$ <br />HVAC InfrastructureN+1T2,000$ 400340032,400,000$ <br />HVAC Air Handlers2NT3,000$ 8.5568.5561,428,000$ <br />Heat and Smoke DetectionN/ASF5$ 19,200119,200196,000$ <br />VESDAN/ASF30$ 4,80014,8001144,000$ <br />Fire Suppression - Wet PipeN/ASF5$ 14,400114,400172,000$ <br />Fire Suppression - Pre-ActionN/ASF10$ 4,80014,800148,000$ <br />Fire Suppression - GasN/ASF35$ 4,80004,8000-$ <br />Environmental MonitoringN/ASF20$ 19,200119,2001384,000$ <br />Security Cameras / AccessN/ASF10$ 19,200119,2001192,000$ <br />Engineering and DesignN/A% of project7.5%2,784,930$ <br />General ContractorN/A% of project9.0%3,341,916$ <br />CommissioningN/A% of project2.0%742,648$ <br />Project ManagementN/AMonthly Rate15,000$ 12180,000$ <br />Total Capital Cost$ 44,181,894 <br />Startup <br />Operating CostsRedundancyMetricUnit CostUnit SizeCalc Unit QtyOverride SizeOverride QtyCost <br />Distribution Switchgear2Nea10,000$ 4440,000$ <br />GeneratorsN+1per kW7$ 1,6003333,600$ <br />UPSN+1per kW20$ 2338837,280$ <br />PDUs2Nea500$ 150273216,000$ <br />HVAC InfrastructureN+1per Ton50$ 4003360,000$ <br />HVAC Air Handlers2Nper Unit1,600$ 5695689,600$ <br />Heat and Smoke Detection1per sq ft0.50$ 19,200119,20019,600$ <br />VESDA1ea0.50$ 4,80014,80012,400$ <br />Fire Suppression - Wet Pipe1ea0.50$ 14,400114,40017,200$ <br />Fire Suppression - Dry Pipe1ea0.50$ 4,80014,80012,400$ <br />Fire Suppression - Gas1ea0.50$ 4,80004,8000-$ <br />Environmental Monitoring1per sq ft5.00$ 19,200119,200196,000$ <br />Utilitiesper kWh$0.087,971,600637,728$ <br />Annual Operating Cost$ 1,031,808 <br />Financial Metrics <br />15-Year TCO$ 53,747,814 <br />25-Year TCO$ 69,977,094 <br />Monthly Cost per Rack (15 years)$ 2,589 <br />Monthly Cost per Rack (25 years)$ 1,822 <br /> <br />2020 MTC DCLM DC Model (1) Page 18 of 20 <br /> 2020 Excipio Consulting, LLC. All Rights Reserved. This document is proprietary and confidential and may not be duplicated, <br />redistributed, or displayed to any other party without the expressed written permission of Excipio Consulting LLC. <br /> <br />