My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. #73 - Cable Franchise
Centerville
>
Ordinances
>
Uncoded Ordinances
>
Ord. #73 - Cable Franchise
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 5:11:00 PM
Creation date
2/8/2021 5:04:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.1.11. The Grantee shall not assert or otherwise raise any claim before a court of <br />competent jurisdiction or any administrative agency alleging that, as of the <br />Effective Date of this Franchise, the minimum System design and performance <br />requirements set forth in this Franchise are unenforceable under or inconsistent <br />with then current applicable laws or regulations, or any orders, rules or decisions <br />of the FCC. <br />4.2 System Construction Timetable. <br />4.2.1 Grantee shall complete all construction related to the System Upgrade and shall <br />fully activate the upgraded System no later than July 15, 2004. The Grantee shall <br />provide, where reasonably feasible, for phased activation launches of the <br />subscriber network. Failure to timely complete construction of the System <br />Upgrade shall be a violation of this Franchise. <br />4.2.2 Within ninety (90) days after the Effective Date of this Franchise, the Grantee <br />shall commence application for necessary permits, licenses, certificates and <br />authorizations which are required in the conduct of its business. <br />4.2.3 Within ninety (90) days after the Effective Date of this renewed Franchise, <br />Grantee shall commence System preliminary construction, walkout, electronic <br />design, fiber design, and other associated System Upgrade and construction steps, <br />and shall give written notice to the City and the Commission upon <br />commencement of such activities. <br />4.2.4 All construction shall be performed in accordance with applicable laws, <br />procedures, standards and regulations, except where specifically waived by the <br />City. <br />4.2.5 The Grantee shall provide the City and the Commission with notice prior to <br />commencement of steps of the System Upgrade in which possible service <br />disruptions or physical construction activities may occur, including but not <br />limited to: (i) tap pedestal replacements; (ii) amplifier/line extender pedestal <br />replacements; (iii) underground duct replacement; (iv) overlashing of aerial fiber <br />optic lines; and (v) underground placement or replacement of coaxial cables. <br />4.2.6 Upon completion of the System Upgrade initial design, the Grantee shall make <br />available to the City and the Commission for review, on a confidential basis, a <br />concise description of the facilities proposed to be erected or installed, and <br />subscriber network design prints/map(s), which shall include at least the <br />following elements: (i) trunk and feeder design; (ii) fiber routes; (iii) Node <br />locations; (iv) standby power supply locations; and (v) areas of the City to be <br />served by each Node. <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.