My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. #73 - Cable Franchise
Centerville
>
Ordinances
>
Uncoded Ordinances
>
Ord. #73 - Cable Franchise
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 5:11:00 PM
Creation date
2/8/2021 5:04:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2.7 The Grantee shall maintain complete and comprehensive as -built drawings of the <br />subscriber network, I -Net and DFOI throughout the Franchise term, and shall <br />make them available to the Commission and/or the City for inspection, upon <br />request, on a confidential basis. As -built drawings shall be updated continually as <br />changes occur in the subscriber network, the I -Net and/or the DFOI. The Grantee <br />shall provide to the City, upon request, (including electronic form) copies of all <br />as -built drawings showing the Grantee's facilities and equipment in the Rights -of - <br />Way, and on private property where necessary to investigate citizen complaints or <br />to determine Franchise compliance. The Grantee shall also maintain throughout <br />the Franchise term a full set of headend and hub routing diagrams, showing <br />routing from source input to combiner output and routing between headends and <br />hubs, for all subscriber network, I -Net and DFOI signal transport. Such routing <br />diagrams shall be made available to the City and/or the Commission for <br />inspection, upon request, on a confidential basis. <br />4.3 Periodic Progress Renortin�. <br />Following commencement of construction of the System Upgrade, the DFOI and the I - <br />Net upgrade or any similar major construction, the Grantee shall, upon request of the <br />Commission, meet with the Commission and provide an update on the progress of the <br />System Upgrade, the DFOI construction and the I -Net upgrade or other construction. <br />4.3.1 Public Notification. Prior to the beginning of the System Upgrade, and <br />periodically during each phase of construction, the Grantee shall inform the public <br />and its Subscribers, through various means, about: (i) the progress of the System <br />Upgrade or major construction; (ii) areas where construction crews will be <br />working; and (iii) any expected temporary interruptions to existing services which <br />may occur. <br />4.3.2 Delays in the Construction. The Grantee shall be excused from the timely <br />performance of its obligation to begin and complete any System Upgrade, DFOI <br />construction, and I -Net upgrade within the time specified herein, for the following <br />occurrences: <br />4.3.2.1 Any "Force Maj eure" situation, as described herein; and <br />4.3.2.2 Unreasonable failure or delay by the City to issue any permits or <br />permission upon a timely and complete application submitted to <br />the City by the Grantee or its contractor representative and tender <br />of any required permit fee. <br />4.3.3 Consequences of Delays. Absent a showing of excusable delay pursuant to <br />subsection 4.3.2 above, should the Grantee be unable to demonstrate the <br />commencement or timely completion of the System Upgrade, the DFOI and the I - <br />Net upgrade by the times specified herein, or be unable to reasonably justify any <br />delays, then the Grantee shall be in violation of a material provision of this <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.