Laserfiche WebLink
a <br />April 6, 2021 <br />Centerville Planning & Zoning Commission <br />Page 6 of 9 <br />RE: Rehbein Commercial - Preliminary Plat <br />Temporary cul-de-sac <br />The cul-de-sac at Kwik Trip is to be built initially with a temporary easement for a portion of it over <br />the Kwik Trip lot. If and when Street A is extended that easement would be vacated in favor of the <br />Street A ROW shown on the plat. <br />Sidewalks & Trails <br />Sidewalks and trails are proposed in some locations in the plat and site plan, and there are existing <br />sidewalks and trails along some roadways adjacent to the plat. We recommend additional <br />sidewalks and trails to help complete an integrated system, as summarized below and illustrated <br />on the next page. <br />• Existing Trail: <br />0 21 st Avenue - E side <br />0 Main Street - S side <br />• Existing Sidewalk: <br />0 Main Street - north side, W of 20t" Avenue, plus short segment on W side of 20t" <br />0 21 It Avenue - W side in Lino Lakes, N of Rehbein plat <br />City Recommendations/Priorities: <br />1. N side of Main, sidewalk along Lot 1 /1 A, connecting 20t" to Kwik Trip <br />2. N side of Main, sidewalk along Kwik Trip lot, continuing Main Street sidewalk <br />3. N side of Main, sidewalk on Bank lot, connecting Kwik Trip to 21 It Avenue <br />4. W side of 21 It Avenue, sidewalk along Lot 3, when it develops <br />5. W side of 21 It Avenue, sidewalk on Bank lot <br />6. E side of 20t" Avenue, sidewalk along Lot 1 /1 A, when it develops <br />7. Street A, trail on S side, connecting Kwik Trip to Lot 1 /1 A, when it develops <br />8. Street A, trail on S side, across Lot 1 /1 A, when it develops, continuing trail to 20t" <br />• Internal Sidewalks/City Recommendations: <br />o Norbella Senior Living - sidewalk around N, W and S sides to provide loop for <br />residents and to connect W to Willow Glen townhomes and E to 21 It Avenue <br />o Belleville Apartments - continue internal sidewalk S to connect to Norbella loop <br />