Laserfiche WebLink
6. Water Access Charges (WAC) are due at the time of building permit issuance. <br />Stormwater <br />1. A permit through the Rice Creek Watershed District will be required. City <br />standards for stormwater are in alignm <br />comments, if necessary, at that time. <br />2. A stormwater area charge applies at the time of Final Plat. It is based on the <br />square feet of impervious surface ($0.07/sf impervious). The estimate, based on <br />the current layout of the site is: $3,849.37 <br />3. The furthest downstream manhole with access from the parking lot should include <br />a sump as a sediment trap. <br /> <br />Streets/Walks <br />1. The plans show a sidewalk along the outer perimeter of the building, except the <br />st <br />north side. All walks on the site and the sidewalk adjacent to the site, in the 21 <br />Avenue and Street A rights-of-way will be privately maintained. The sidewalk <br />that leads from the site and points walkers directly across Street A for access to <br />the walkway along the south side of Street A should be evaluated further. Mid- <br />block crossings are generally discouraged, especially along collector roads, such <br />as Street A. A sidewalk network along the north side of Street A should be <br />evaluated to allow for better pedestrian crossing choices. <br />2. Ped Ramps should be installed on either side of the entrance driveway if a <br />sidewalk network is constructed along the north side of Street A. <br /> <br />Miscellaneous <br />1. A Conditional Use Permit (CUP) will be required for the operation of a <br />Specialized Care Facility. <br />2. The city reserves the right to review future iterations of the development plans. <br />3. Lighting, parking, landscaping, signage, setback and park dedication requirements <br /> <br />Sincerely, <br />Mark R. Statz, PE <br />City Administrator/City Engineer <br />Attachments: None <br /> <br />