Laserfiche WebLink
<br /> <br />Exhibit B <br /> <br />Centerville, at its cost, will operate, inspect and maintain the stormwater management facilities <br />indicated within the plans and specification under section 1 of the MOA as follows: pond, storm <br />water reuse/ irrigation system. Centerville will: <br /> <br />a. Operate the water reuse/irrigation system for irrigation supply when weather <br />conditions and pond water elevations are suitable for irrigation activities. <br />b. Inspect stormwater reuse/irrigation system at least once annually. <br />c. Accumulated sediment and debris will be removed, and erosion or structural problems <br />will be corrected when reasonably necessary so that the facility continues to operate as <br />designed. <br />d. Perform routine maintenance activities on the water reuse/irrigation system. <br />e. Collect pump run-time data or flow meter data on an annual basis following the <br />installation of the system. These data and pump capacity ratings will be submitted to <br />the RCWD on an annual basis once the system is in operation for the first full three years <br />of operation. At the end of the third growing season, and each subsequent growing <br />season, the average of the prior three full seasons' irrigated volume will be used to <br />determine the final capacity of the facility. After the first full three years of operation of <br />the system, pump run-time data or flow meter data must be collected on an annual <br />basis and reported to the RCWD to verify the system is operating at the approved <br />capacity. <br /> <br /> <br />