My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-28 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2021
>
2021-04-28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 10:48:04 AM
Creation date
4/28/2021 10:47:22 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 6, 2021 <br />Centerville Planning & Zoning Commission <br />Page 6 of 9 <br />RE: Rehbein Commercial – Preliminary Plat <br />Temporary cul-de-sac <br />The cul-de-sac at Kwik Trip is to be built initially with a temporary easement for a portion of it over <br />the Kwik Trip lot. If and when Street A is extended that easement would be vacated in favor of the <br />Street A ROW shown on the plat. <br />Sidewalks & Trails <br />Sidewalks and trails are proposed in some locations in the platand site plan, and there are existing <br />sidewalks and trails along some roadways adjacent to the plat. We recommend additional <br />sidewalks and trails to help complete an integrated system, as summarized below and illustrated <br />on the next page. <br />ExistingTrail: <br />st <br />o 21Avenue – E side <br />o Main Street – S side <br />Existing Sidewalk: <br />thth <br />o Main Street – north side, W of 20Avenue, plus short segment on W side of 20 <br />st <br />o 21Avenue – W side in Lino Lakes, N of Rehbein plat <br />City Recommendations/Priorities: <br />th <br /> to Kwik Trip <br />1.N side of Main, sidewalk along Lot 1/1A, connecting 20 <br />2.N side of Main, sidewalk along Kwik Trip lot, continuing Main Street sidewalk <br />st <br />Avenue <br />3.N side of Main, sidewalk on Bank lot, connecting Kwik Trip to 21 <br />st <br />4.W side of 21Avenue, sidewalk along Lot 3, when it develops <br />st <br />5.Wside of 21Avenue, sidewalk on Bank lot <br />th <br />6.E side of 20Avenue, sidewalk along Lot 1/1A, when it develops <br />7.Street A, trail on S side, connecting Kwik Trip to Lot1/1A,when it develops <br />th <br />8.Street A, trail on S side, across Lot 1/1A, when it develops, continuingtrail to 20 <br />Internal Sidewalks/City Recommendations: <br />o NorBellaSenior Living – sidewalk around N, W and S sides to provide loop for <br />st <br />Avenue <br />residents and to connect Wto Willow Glen townhomes and E to 21 <br />o Belleville Apartments – continue internal sidewalkS to connect to NorBellaloop <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.