Laserfiche WebLink
April 6, 2021 <br />Centerville Planning & Zoning Commission <br />Page 9 of 9 <br />RE: Rehbein Commercial – Preliminary Plat <br />4)Public sidewalks and trails will be built as proposed on the site plan and preliminary plat, <br />with additional sidewalks and trails builtas illustrated and prioritized in this planning report, <br />as follows, all to be reviewed and approved by the City Engineer: <br />a.The trail on the south side of Street A will be built at the same time Street A is <br />st <br />Avenue and the cul-de-sac at the proposed Kwik Trip. <br />constructed between 21 <br />b.Sidewalk on the north side of Main Street along the south side of Lot 1 Block 1 will <br />be built at the same time as development on Lot 2 Block 1 (proposed Kwik Trip). <br />c.Sidewalk on the north side of Main Street along the south side of Lot 2 Block 1 <br />(proposed Kwik Trip) will be built with the development on Lot 2 Block 1. <br />st <br />d.Sidewalkon the west side of 21Avenue along the east side of Lot 3 Block 1 will be <br />built with the development on that lot. <br />th <br />e.Sidewalk on the east side of 20Avenue along the west side of Lot 1 and Lot 1A <br />Block 1 will be built with the development and final platting of those lots. <br />th <br />Avenue when <br />f.The trail on the south side of Street A will be extended west to 20 <br />development is approved on Lot 1 and Lot 1A Block 1, both the segment on Lot 2 <br />Block 1 and the segment on Lot 1/1A. <br />5)The temporary cul-de-sacproposed at the west end of Street A will be built with Street A <br />within a temporary easement over a portion of Lot 2 Block 1. Thateasement will be <br />th <br />vacated if and when Street A is extended to 20Avenue. <br />6)Park dedicationwill be paid according to the City’s fee schedule for each lot in the plat <br />when it is recorded in a final plat. <br />7)Easements for drainage and utilities will be provided as required by the City Engineer. <br /> <br />