Laserfiche WebLink
Weed control <br />The Planning and Zoning Commission again he <br />local residents regarding noise issues and the possible revision of the Conditional Use <br />Permit. The Commission asked staff to come back with some direction from the city <br />attorney. That information will be presented at the next P&Z Commission meeting. <br /> <br />CenterMart - Conditional Use Permit <br />City staff met with CenterMart ownership to discuss compliance issues and look at <br />potential revisions to their Conditional Use Permit. We think there are some issues that <br />could be mitigated while enhancing their business opportunities. Our conversations will <br />continue and will work towards compliance and potential changes in the CUP. <br /> <br /> <br />STORMWATER/WETLAND <br />Local Water Plan <br />City staff are exploring opportunities to reduce redundancies in erosion control inspection <br />work with Rice Creek Watershed District. <br /> <br />SEWER AND WATER <br />Water Supply Plan <br />The Department of Natural Resources has approved our Water Supply Plan. The Council <br />must now officially adopt it. A thank you is in order to city staff and Stantec for all the <br />work in getting this through the long process for approval. The city should be proud of <br />its strong water supply infrastructure which includes two wells and an interconnection <br />with the city of Lino Lakes. Clean drinking water is far too often something we take for <br />granted. Having three reliable sources of water means our citizens, and their health are <br />protected by redundant and resilient systems. <br />Wellhead Protection Plan <br />The Minnesota Department of Health recently approved our groundwater model. Our <br />consultant is in the process of using those results to map out our new Wellhead Protection <br />Area, which is the final stage of Part 1 of the Plan. <br />Water Connection Ordinances <br />City Council adopted the ordinance for water and sewer connections. The summary <br />ordinance has been published and is now in full effect. <br />Downtown Water Main and Street Reconstruction <br /> <br />