Laserfiche WebLink
14.CLEAN UP.The Developer shall daily clean dirt and debris from streets that has <br />resulted from construction work by the Developer, its contractors, subcontractors, agents or <br />assigns.Prior to any construction on the Land, the Developer shall identify in writing a responsible <br />party for erosion control, street cleaning, and street sweeping.During such times as construction <br />isactive, developer or his agent shall frequently inspect streets and make sure that they are swept <br />of dirt and debris. <br />15.SITE PROVISIONS. <br />A.Developer shallbe responsible for security at the Landduring construction. <br />B.Developer shall maintain communication with the neighboring propertiesand <br />address any concerns raised by the neighbors in a timely manner. <br />C.Developer shall repair damage to the neighboring streets, curbs, trails,or other <br />public infrastructure caused by construction of theProject, at their own expense. <br />D.Developer shall provide traffic control for any work within the right-of-way. <br />16.OWNERSHIP OF IMPROVEMENTS.Upon completion and acceptance of the <br />work and construction required by this Agreement, thePublicImprovements lying within public <br />right-of-way and easementsshall become City Property without further notice or action. Those <br />improvements shall includebut are not limited tothe sanitary sewer, potable water system, storm <br />sewer, roads, sidewalks, trails,draintile, signage and street lighting (unless owned by the utility). <br />The extent of sewer and water service lines ownership is further defined in city code. The <br />Developer shall retain ownership and maintain all ponds and other erosion control measures, and <br />the Final Plat shall indicate aneasementin favor of the Public for stormwater use, access,and <br />maintenance.However, the Developer shall maintain ponds and other erosion control measures <br />until the development is complete in conformance with this Agreement, and provided that the <br />engineer for Developer shall certify that the ponds have been cleaned and provide the designed <br />holding capacity prior to the Citycertifying the ponds.All of the easements set forth in this Section <br />must be reduced to writing and recorded on the Final Plat. <br />Version 09/17/2021 Page 9 <br /> <br />