My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-11-02 P & Z Packet - Revised
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2021
>
2021-11-02 P & Z Packet - Revised
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 1:39:00 PM
Creation date
11/2/2021 1:29:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTRA HOMES L <br />Parkine: <br />- Parking is concentrated behind the buildings located along the internal private alley, oriented <br />away from the public streetscape. <br />- Each home will provide residents with 1-2 enclosed garage parking spaces. <br />- Each home will provide an additional 1-2 guest parking stalls via private driveways. <br />- Parking Counts: <br />- 46 private garage stalls <br />- 46 private driveway spaces <br />- 92 Total parking spaces (Ratio of 3.54 stalls / dwelling unit) <br />Connectivity - Streets and Trails: <br />Sorel Quarter will reconstruct the existing regional public trail to allow for continued public access <br />running N-S through the project site. The public trail will also continue along Sorel Street and <br />North -South along Centerville Road to maximize public and private access. The reconstructed trail will <br />also provide a buffer between existing homes to the west and newly constructed homes. <br />Sorel Quarter also proposes a contribution towards a new, enhanced streetscape design along <br />Centerville Road. The proposed design update includes: <br />- Expanded urban street section: 8' concrete detail sections + 8' bituminous trail <br />- 4 New decorative public street lights <br />- 5 New overstory trees - Boulevard Linden and Red Maple species <br />'a <br />TO <br />VAR. <br />GOr+GREiE SIpEWmLK <br />Ek NN6 / TRAIMINW GpkNEC�iGry <br />STAMPEp C9MCRE�E f - tttNL.. <br />WAIT( W/ INT.CTF DOLOR � � RO SO. FREE CRATE <br />OGMPACIER BAH ROOT RMRIER <br />PLANTING SOIL HMGWOM MULCH <br />pRAIN1RE SILYA GfLL MOpUIE <br />TYPICAL STREETSCAPE SECTION <br />CENTERVILLE RD <br />(IN FEET) <br />Centra Homes - Preliminary Plat + PUD Application: Sorel Quarter, Centerville 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.