My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-01-19 EDA Packet
Centerville
>
EDA
>
Agenda Packets
>
2022
>
2022-01-19 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2022 9:20:04 AM
Creation date
1/17/2022 9:19:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Listed below are the facility assets and overall size of the assets to be included in this Study. <br />KellyÔs Bar and Grill: 2,400 SF <br />The Southern Rail: 4,000 SF <br />Chef Hot Hands: 2,500 SF <br />Task 1 Ï Coordinate and Collect (Project Kick-Off Meeting) <br />CR-BPS will collect and review all available background information including, but not <br />limited to: drawings, utility data (5 years preferred), past studies, building history, <br />maintenance and operation manuals, etc. <br />The Client and CR-BPS will conduct a Project Kick-Off meeting. The goal of this <br />meeting is to: <br />Review background information <br />Present and review schedule <br />Customize Asset Management software (VFA Facility) data entry standards and <br />protocols to align with CityÔs standards <br />Task 2 Ï On-site Assessments & Department Interviews <br />CR-BPSÔs Facility Assessors will conduct an on-site, physical inspection of each asset. <br />The CR-BPS team will also conduct interviews with Staff if available. CR-BPS shall be <br />escorted by a City representative - preferably the building manager or <br />operations/maintenance supervisor - for building access and interviews. <br /> <br />Task 3 Ï Data Entry <br />CR-BPS will enter all facility data into the FSAM software tool. <br />For this project, the City will use CR-BPSÔs in-house FSAM software tool (VFA license). <br />If the City prefers to purchase their own license, CR-BPS will facilitate negotiations and <br />purchase agreements as needed. Note: CR-BPS does not benefit financially from the <br />CityÔs purchase of VFA. <br /> <br />Task 4 Ï Fully Populated Asset Management Program Ï Final Deliverable <br /> <br />Due to the dynamic nature of this Asset Management process, we anticipate <br />customizing final deliverables to the ClientÔs needs. As we work through this process, <br />we will uncover what deliverables that will best serve the Client in the short and long <br />term. Thus, minimum deliverables are listed below, and may be changed based on <br />mutual consent. <br /> <br /> <br />WWW.CR-BPS.COM 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.