Laserfiche WebLink
(5) It is understood that if soil is excavated from the development and moved off the property, all <br />city and county streets which are used for hauling shall be maintained free of debris and soil; and <br />property within the city limits upon which the soil is stored shall also be maintained free of <br />debris and have adequate erosion control. <br />(G) Street lights. <br />(1) Residential street lighting shall be owned, installed, operated and maintained by the electric <br />utility company servicing the development. The city and the electric utility company shall enter <br />into a contractual agreement on the rate and maintenance of the street lighting system. <br /> <br />(2) It shall be the responsibility of the developer to: <br /> <br />(a) Reimburse the city for the operating cost of the street lighting system for a period which <br />will extend to one year after the utilities and improvements of the development have been <br />accepted by the city or until the time that 50 percent of the lots in the subdivision are <br />occupied, whichever is greater. <br /> <br />(b) Pay the electric utility company any costs incurred in the installation of the street lighting <br />units; and <br /> <br />(c) The above street lighting costs shall be guaranteed in the same manner as the other <br />development improvements and the city shall be entitled to draw upon the letter of credit <br />posted herein in the event of nonpayment. <br /> <br />(H) Storm sewer. The developer shall dedicate and survey all stormwater holding ponds as required by the <br />city. The developer shall be responsible for the storm sewer cleaning and holding pond dredging, as <br />required, by the city prior to or until the time that all primary buildings within the subdivision are <br />completed or two years after final acceptance of the streets by the city, whichever occurs first. <br /> <br />(I) Site grading. The developer shall be responsible for securing all necessary approvals and permits from <br />all appropriate federal, state, regional and local jurisdictions prior to the commencement of site grading. <br /> <br />(J) Streetscape. The developer shall make provision that all gas, telephone and electric utilities shall be <br />installed to serve the development as per the city streetscape plan. <br /> <br />(K) Ground cover control. All unoccupied lots shall be maintained in a manner that ground cover will not <br />be allowed to grow more than 12 inches in height at any time. Should the developer not respond within <br />ten days to the cityÓs request to cut the vegetation, the city shall take action to do so and shall bill the <br />developer. If the bill is not paid in 30 days, the cost of the maintenance shall be a lien against the <br />property and may be certified for collection with the real estate taxes, or at the option of the City <br />Council may be deducted from the developerÓs escrow deposit or letter of credit. <br /> <br />(L)Screening. <br />290 ΋tğŭĻ <br /> <br />