My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-23 WS & CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2022
>
2022-02-23 WS & CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2022 12:51:02 PM
Creation date
2/18/2022 6:05:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRAWFORD MERZ <br />CONSTRUCTION • SINCE 1 886 <br />SCOPE OF WORK - CENTERVILLE <br />DEMO: <br />- Demo walls (cross -hatched) as shown. <br />- Salvage all doors/frames/hardware (5) total. <br />- Demo/remove gyp ceilings in all (4) restrooms at 8' height. <br />- Demo ceramic floor tile at (4) restrooms and portion of corridor noted (6x4 area approx). <br />- Demo and remove ceramic wall tile to 4' height at (2) smaller restrooms. Demo and remove <br />ceramic wall tile to 6' height at (2) larger restrooms. <br />- ALTERNATE: Demo VCT flooring/base at the Laundry Room. <br />- ALTERNATE: Demo acoustical ceiling tile (grid to remain) at Radio, Hallway outside of Radio, FD <br />Open Office and Conference/Kitchenette. <br />MILLWORK: <br />- Bench at entry by others. <br />DOORS/FRAMES/HARDWARE: <br />- Relocate (2) WD doors/HM frames & hardware. <br />- Supply (1) 3070 oak door/HM frame/Hardware. <br />- Supply (1) 3070 HM door/HM frame/Hardware. <br />DRYWALL: <br />- Patch at demo. <br />- Construct new insulated walls to 9' height and insulate. (Highlighted Yellow). <br />- Furr out CM walls to 9' height. (Purple dotted areas). <br />- Construct new gyp ceilings at both new restrooms. <br />- Install (4) HM frames. <br />CERAMIC: <br />- Supply/install new ceramic floor tile at (2) restrooms. <br />- Supply/install new wall tile to 5' height all walls in (2) restrooms. <br />ACOUSTICAL: <br />- Supply/install new grid and acoustical ceiling tile at new lobby extension. (Green Cross -Hatch). <br />- ALTERNATE: Supply/install new 2x4 acoustical ceiling tile into existing grid at Radio, hallway <br />outside Radio, FD Open Office and Kitchentte/Conference. <br />FLOORING: <br />- Supply/install new walk off carpet and vinyl base at lobby extension. (Green Cross -Hatch). <br />- ALTERNATE: Supply/install new VCT flooring and vinyl base at Laundry. <br />33 South Sixth Street #4510 Crawford Merz LLC 612-874-9011 <br />Minneapolis, MN 55402 www.crawfordmerz.com Fax 612-874-9015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.