Laserfiche WebLink
CRAWFORD MERZ <br />CONSTRUCTION • SINCE 1 886 <br />PAINTING: <br />- Paint lobby extension and lobby. Paint both restrooms. <br />- Paint (4) hollow metal frames. <br />- Paint (1) HM door. <br />- ALTERNATE: Paint Laundry, Radio, FD Open Office and Kitchenette/Conference Rooms to grid at <br />9' height. <br />PLUMBING: <br />- Demo (4) floor set toilets, (4) wall hung lays, (2) showers/controls, (4) floor drains. <br />- Provide (2) new floor drains. (4) new floor mount toilets with flush valves (currently don't have <br />tanks). <br />- Provide (2) wall mount lays and faucets. <br />- Relocate (1) bi-level drinking fountain with bottle filler. <br />- Concrete cutting/patching as required. <br />- ALTERNATE: Provide alternate for Emergency Shower at the Fire Station Garage (see full size <br />plan, red area). <br />HVAC: <br />- Demo existing exhaust fan that serves restrooms. <br />- Provide and install new PRV on flat roof. All new associated ductwork. <br />- New grilles for restrooms. <br />- Permit, lifts/rigging, roofing. <br />- ALTERNATE: Update mechanical unit serving Fire Hall. <br />FI FrTRIf01 <br />- Demo/remove existing lighting at area of work/restrooms. <br />- Supply/install (4) new LED can lights and (2) 2x2 LED lights. <br />- Supply/install (2) wall mount occupancy sensors. <br />- Wire (1) PRV <br />- Re -switch lighting at corridor to tie into lobby lighting. <br />33 South Sixth Street #4510 Crawford Merz LLC 612-874-9011 <br />Minneapolis, MN 55402 www.crawfordmerz.com Fax 612-874-9015 <br />