Laserfiche WebLink
You don't often get email from.mstatz@centervillemn.com. Learn why this is important <br />EXTERNAL EMAIL <br />CAUTION: This message originated from outside CenterPoint Energy. Do not click on links, open attachments, or enter <br />data unless you recognize the sender, were expecting the content and know it to be safe. <br />Seth, <br />Thanks for chatting today. In summary, we discussed: <br />• PUC authorized 5.1% increase for non-residential customers (like the city) as an interim rate (this can go down, <br />but not up, after contested case hearing) <br />• A pre -hearing was held on 1/13, but was not necessary for us to attend <br />• Multiple public hearings are being scheduled for the last weeks of February and early March. Separate notices <br />will be sent out on those. <br />If you have a nice summary of the rate increases (especially as a percentage), that I could share with the City Council and <br />general public, that would be appreciated. <br />Thanks <br />Mark Statz, PE <br />City Administrator/Engineer <br />City of Centerville <br />1880 Main St. <br />Centerville, MN 55038 <br />O: 651-429-3232 <br />D:651-792-7931 <br />C: 651-775-5126 <br />mstatz(a-)centervillemn.com <br />www.centervillemn.com <br />@centervillemn <br />***** This email is from an external sender outside of the CenterPoint Energy network. Be cautious about clicking links <br />or opening attachments from unknown sources. ***** <br />