My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-05 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2022
>
2022-04-05 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2022 3:34:44 PM
Creation date
4/4/2022 3:34:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
April 5, 2022 <br />Centerville Planning & Zoning Commission <br />Page 2 of 9 <br />RE: Banjo Distribution Center, Preliminary Review – CUP, Site Plan, Plat <br />SITE LAYOUT <br />The generalized site plan is preliminary and is illustrated below. The building is centered on the site, <br />with a 297-car employee parking lot on the east side of the building. A parking lot of almost 600 <br />spaces for delivery vans and their drivers is on the south side of the lot, with an additional staging <br />area of 144 van loading spaces between the building and the van parking area. The north 72 van <br />staging spaces would be covered by an open canopy, but the south group of 72 spaces would <br />be an open parking lot. On the west side of the building are 15 truck loading docks and 13 truck <br />stth <br /> Avenue or Fairview Street; none from 20 Avenue <br />parking spaces. All site access comes from 21 <br />and none from the north side. The applicants have indicated their access driveway onto Fairview <br />Street would line up with the access point for Sutton Transport to the south. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.