My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-03 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2025
>
2022
>
2022-05-03 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2022 7:43:17 AM
Creation date
5/2/2022 7:27:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response: <br />The Stormwater Pond 1 outlet to Clearwater Creek has been reconfigured to discharge at the <br />northwest corner of the site. The flared end section has been pulled back from the bank <br />slope and angled at 45 degrees to channel flow. <br />3. All requirements of the Rice Creek Watershed District shall be met with regard to Stormwater <br />quality, rate and quantity. These requirements align with or are more stringent than the <br />requirements of the city's obligations under its NPDES MS4 Permit. <br />Response: <br />Comment noted. <br />4. The Rice Creek Watershed District is the Local Governing Unit (LGU) for the Wetland <br />Conservation Act (WCA). <br />Response: <br />Comment noted. <br />5. Stormwater Access Charges will apply at a rate of $0.07/sf of new impervious area. <br />Response: <br />Comment noted. An Impervious Area Exhibit is included as part of this response to <br />comments that includes the new impervious area for the site. <br />6. Retaining walls over 4 feet in height require engineer -signed drawings. <br />Response: <br />Comment noted. <br />7. A Stormwater Pollution Prevention Plan (SWPPP) shall be submitted. <br />a. During construction, dust mitigation measures must be employed. <br />b. Clearwater Creek is a highly sensitive water course and special care shall be taken to <br />protect it from turbid discharges from the site. <br />Response: <br />These comments will be incorporated into the SWPPP that will be provided prior to permit <br />issuance <br />Sewer and Water <br />1. The water main along the west side of 21St Avenue should connect to the north/east end of the <br />water main recently installed in Fairview Street. The current plans do not seem to make this <br />connection. <br />Ryan Companies US, Inc. <br />533 South Third Street, Suite 100 <br />Minneapolis, Minnesota 55415 <br />ph:612-492-4000 <br />ryancompanies.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.