My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-03 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2025
>
2022
>
2022-05-03 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2022 7:43:17 AM
Creation date
5/2/2022 7:27:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Access Road Width and Parking Lot <br />• MSFC 503.2.3. - The area will need to support the imposed loads of the fire apparatuses <br />Response: <br />Acknowledged. <br />• MSFC 503.2.1— Dimensions — Fire apparatus access roads shall have an unobstructed width of <br />not less than 20 feet, exclusive of shoulders, except for approved security gates in accordance <br />with Section MSFC 503.6. <br />Response: <br />Comment noted. Access roads are proposed with a minimum width of 24 ft. <br />• Will the parking lots be labeled (Lot A, Lot 8, Lot C, Lot D, Lot E)? <br />Response: <br />The parking lots will not be labeled. <br />Sprinkler System per NFPA 13 and MSFC 903 <br />• Sprinkler system shall abide by NFPA 13 and MSFC Section 903 <br />Response: <br />Comment noted. The system will be designed in accordance with NFPA 13 (2016) <br />• Location of Sprinkler Riser Room(s)? <br />Response: <br />The sprinkler riser/fire pump room will be located at the southeast corner of the building <br />as shown on attached plan sheets Al. 10 and A4.10 <br />• Location of Sprinkler FDC(s)? <br />o Can't identify on the preliminary drawings <br />o FDC's are to be the standard 2-112" connections to accommodate fire department <br />apparatuses <br />Response: <br />A 2-1/2" x 2-1/2" x 4" NST FDC will be provided. The fire department connection will be <br />located on the southeast corner of the building as shown on the Utility Plan sheet C504 <br />• Will the south large canopy section be sprinklered? <br />Response: <br />(2) Dry pipe systems designed for ordinary hazard group II occupancy will be provided for <br />the south canopy <br />Ryan Companies US, Inc. <br />533 South Third Street, Suite 100 <br />Minneapolis, Minnesota 55415 <br />ph:612-492-4000 <br />ryancompanies.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.