My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-01 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2022
>
2022-06-01 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2022 1:34:20 PM
Creation date
5/27/2022 1:34:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Overview and Need (25 points; 2,050 character maximum including spaces) Provide a summary of the <br />project, why this funding is needed, what project work will not happen without these grant funds, and expected <br />outcomes. This should include a descripon of the project locaon (citywide project, speci ŋ c parks, etc.). A successful <br />applicaon will demonstrate a readiness to take on a project of the proposed scope and size, and will focus on <br />signi ŋ cant public safety concerns. <br />Project Timeline (20 points; 2,600 character maximum including spaces) Describe the approximate project schedule <br />showing intermediate steps and milestones for acvies described in this applicaon or required by the RFA. A success- <br />ful meline will provide speci ŋ c dates, is easy to comprehend, and will follow EAB best management pracces. <br />Page 2 of 4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.