My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-01 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2025
>
2022
>
2022-06-01 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2022 1:34:20 PM
Creation date
5/27/2022 1:34:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
School staff and consultants were able to find a work-around to solve some supply chain issues. <br />The work in the building is nearing completion and should receive their certificate of <br />occupancy soon. <br /> <br />stnd <br />(3)(4) Old Mill Estates 1 and 2 Additions <br />A Letter of Credit reduction was granted at the last City Council meeting. The city still retains <br />more than $80,000 in a letter of credit as well as a 2-year warranty bond on the public <br />improvements. <br /> <br />The City is in discussion with the homeowner near the cul-de-sac on Old Mill Court, exploring <br />alternative routes for the trail. The city will continue to hold security for the completion of the <br />trail until this process plays out and the trail link is completed. Staff recently re-engaged with <br />a contractor who provided the lowest preliminary estimate for the work and will firm up a <br />quote from them to see if the project is feasible within the homeownerÓs budget. <br /> <br />th <br />(16) Centerville Storage (20Ave. Mini Storage) <br />A Grand Opening will be held on June 7, from Noon to 1 PM. Come check it out! <br /> <br />(1) Bay View Villas (Waterworks Site) <br />Correspondence has been sent to the developer regarding final punch list items. We are <br />awaiting a response. <br /> <br />(8) Atlas Villas Memory Care Project (1825 <br />Main Street) <br />Work inside the building is nearly complete. The <br />owner is now hiring staff and working towards <br />licensure, which should take 1 to 2 months. <br /> <br />An image of the exterior of the building is shown <br />to the right. <br /> <br />(10-14) Rehbein Commercial <br />st <br />Sidewalk work along 21 Avenue has been <br />completed with irrigation restoration and <br />boulevard sodding to follow. <br /> <br />(13) Kwik Trip <br />Staff has been working with Kwik TripÓs staff to get securities and other agreements in place. <br />The owner has communicated that construction could begin by mid-summer, 2022. <br /> <br />Recently, the siteÓs engineer finalized plans for the right turn lane to be constructed on Main <br />Street on the south side of the store and obtained signatures from both the City and County <br />thst <br />Engineers. With this work, the sidewalk from 20 to 21 Avenues on the north side of Main <br />st <br />Street and up 21 Avenue from Main Street to Michaud Way will be constructed. <br /> <br />(11) Norbella Senior Living <br />Work on the interior of the building continues, including HVAC, plumbing and electrical. A <br />September opening is still the target. <br /> <br />(2) Peterson Shores <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.