Laserfiche WebLink
(5) Monitoring requirements and facilities. Monitoring facilities to allow inspection, sampling and <br />flow measurement of the building sewer and/or internal drainage systems shall be provided and <br />operated by all significant industrial users or other industrial users which may have a significant <br />effect as determined by the city. The monitoring facilities shall be situated on the userÓs <br />premises. There shall be ample room in or near the sampling manhole or facility to allow <br />accurate sampling and compositing of samples for analysis. The facility, sampling and <br />measuring equipment shall be maintained at all times in a safe and proper operating condition at <br />the expense of the user. <br /> <br />(6) Inspection of userÓs facilities. <br />(a) The city may inspect the facilities of any user to ascertain whether the purpose of this <br />section is being met and all requirements are being complied with. Persons or occupants <br />of premises where wastewater is created or discharged shall allow the city ready access at <br />all reasonable times to all parts of the premises for the purposes of inspection, <br />observation, measurement, sampling, testing, record examination or in the performance <br />of any of their duties, with the restriction that the city does not interfere with the userÓs <br />operation. The city, Metro Sewer Board, MPCA and EPA shall have the right to set up <br />on the userÓs property such devices as are necessary to conduct sampling, inspection, <br />compliance monitoring and/or metering operations. Where a user has security measures <br />in force which would require proper identification and clearance before entry into their <br />premises, the user shall make necessary arrangements with any security guards so that <br />upon presentation of suitable identification, the city, MPCA and EPA will be permitted to <br />enter, without delay, for the purposes of performing their specific responsibilities. <br /> <br />(b) The city shall have no authority to inquire into any industrial processes beyond that point <br />in the process having a direct bearing on the kind and source of discharge to the sewers or <br />waterways or facilities for treatment. <br /> <br />(c) While performing the necessary work on private properties referred to in divisions <br />(D)(6)(a) and (D)(6)(b) above, city employees shall observe all safety rules applicable to <br />the premises established by the company. <br /> <br />(E) Civil action. If any person discharges sewage, industrial wastes or other wastes into the cityÓs <br />wastewater disposal system contrary to the provisions of this section, federal or state pretreatment <br />requirements or any order of the city, the city may commence an action for appropriate civil relief. <br /> <br />Ord. 2d 91, amended 09/26/2018. <br /> <br />§ 51.11 RULES AND REGULATIONS RELATING TO STORMWATER DRAINAGE UTILITY. <br /> <br />(A) Statutory authority. M.S. £ 444.075 (Ðthe ActÑ) authorizes cities to impose just and reasonable charges <br />for the use and availability of storm sewer facilities (ÐchargesÑ). By this chapter, the city elects to <br />exercise such authority. <br /> <br />46 ΋tğŭĻ <br /> <br />