My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-28 WS & CC Meeting Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2022
>
2022-09-28 WS & CC Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2022 8:52:54 AM
Creation date
9/26/2022 8:52:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Braun Intertec Corporation Phone: 952.995.2000 <br />11001 Hampshire Avenue SFax:952.995.2020 <br />Minneapolis, MN 55438Web:braunintertec.com <br />September 21, 2022Proposal QTB166153 <br />Mr. Mark Statz <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038 <br />Re:Proposal for Construction MaterialsTesting Services <br />City Hall Parking Lot / Mill & Overlay <br />1880 Main Street <br />Centerville, Minnesota <br />Dear Mr. Statz: <br />Braun Intertec Corporation is pleased to submit this revised proposal to provide construction materials <br />testing services for the City Hall Parking Lot / Mill & Overlay Project in Centerville, Minnesota. <br />Since our inception in 1957, we have grown into one of the largest employee ownedengineering firms in <br />the Midwest. With more than1,000 employee owners, retaining our firm gives you access to a diverse <br />range of services and professionals you can consult with ifthe unforeseen occurs. The size of our <br />company also allows us to respond quickly when schedule constraints occur. <br />Our Understanding of Project <br />Weunderstand this project will include placement of aggregate base and select granular materials, new <br />concrete curb and gutter, sidewalk, along with new bituminous pavement. Mill and Overlay operations <br />will also be a part of this project. <br />Available Project Information <br />This proposal was prepared using the following documents and information. <br />Email correspondence with Kellie Schlegel from Stantec Inc. regarding scope of services. <br />Scope of Services <br />Services will beperformed under the direction of a licensed professional engineer. Testingservices will <br />be performed on an on-call, as-needed basis as requested and scheduled by you or your on-site project <br />representative. After reviewing available information to determine compliance with project plans and/or <br />specifications and other design or construction documents, our scope of services for the project will be <br />limited to the tasks defined below. <br />AA/EOE <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.