City of Centerville <br />Proposal QTB166153 <br />September 21, 2022 <br />Page 2 <br /> <br />Soil Related Services <br />Sample and test aggregate base and select granular materials for compliance with the project <br />documents. This task includes laboratory gradation testing. <br /> <br />Concrete Related Services <br />Sample and test fresh concrete associated with general concrete placement for compliance <br />with the project documents and cast test cylinders for laboratory compressive strength <br />testing. We assume that we will be able to appropriately dispose of excess concrete (and <br />associated wash water) on site at no additional cost to us. <br /> <br />Prepare 4-inch by 8-inch cylinders for compressive strength testing. One set of three <br />cylinders will be cast each trip that will be tested at 28 days. If field cure cylinders are <br />requested, each additional cylinder will be charged at the unit price listed in our cost <br />estimate. <br /> <br />Measure and report the compressive strength of the concrete test cylinders for compliance <br />with the project documents. <br /> <br />Bituminous Related Services <br />Sample and test bituminous pavement materials for compliance with the project documents. <br />Perform tests on these samples which will include asphalt content and extracted aggregate. <br /> <br />Measure the in-place density of the fresh bituminous with a nuclear density gauge to <br />observe and document the contractor’s roll pattern. <br /> <br />Consulting, Project Communication and Reporting Services <br />Project management, including scheduling of our field personnel. <br /> <br />Review test reports and communicating with you and the parties you may designate such as <br />the project contractor(s), and other project team members, as needed. <br /> <br />Transmit test results to the project team on a weekly basis. <br /> <br />Basis of Scope of Work <br />The costs associated with the proposed scope of services were estimated using the following <br />assumptions. If the construction schedule is modified or the contractor completes the various phases of <br />the project at different frequencies or durations than shown in this proposal, we may need to adjust the <br />overall cost accordingly. The scope of work and number of trips required to perform these services are as <br />shown in the attached table. Notable assumptions in developing our estimate include: <br /> <br />We assume three trips to pick up samples for laboratory testing of aggregate base, select <br />granular, and topsoil borrow materials. <br /> <br />We assume four sets of concrete tests will be required to complete the project. <br /> <br /> <br />