My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-10-04 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2022
>
2022-10-04 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2022 7:07:27 AM
Creation date
10/3/2022 7:07:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Construction on the site is in full swing, with the block and steel framing of the building going up this <br />week. A fiber optic line is being relocated, which needs to happen before turn lane construction can <br />continue. The store anticipates opening around the end of December. <br />(11) NorbellaSeniorLiving <br />A grand opening is scheduled for October 13 at 10:00 AM. The public is welcome to come and take a <br />tour of the new facility. <br />(2)PetersonShores <br />Staff met with a prospective builder on site to discuss sewer and water connections as well as grading and <br />driveway issues. <br />(17, 19) RehbeinIndustrial <br />The developer’s contractor continues to work on minor punch list itemsand will need to patch the base <br />course of paving where the water main connection was made. The city is working with the developer on <br />a plan to delay the wear course paving until 2023. <br />(19) SuttonTransport <br />Paving and landscaping work are complete and a final inspection has been scheduled. <br />(15) 2050/2070 MainStreet – American Roofing Supply <br />Landscaping crews have finished their work and the site is fully paved and ready for operations. Gates at <br />the two entrances are being installed. <br />(18) Max Storage (FairviewStreet) <br />The Conditional Use Permit (CUP) has now been sent in to the County for recording and a grading permit <br />has been issued.The building permit is imminent as soon as plumbing and mechanical plans are finalized. <br />(17) Amazon FulfillmentCenter <br />Grading, utilities, parking lot and building pad construction are all moving along, on schedule. Water <br />st <br />main installation along 21 Ave. is now complete. <br />A kick-off meeting for the Corridor Study has been held. The study will prioritize area-wide transportation <br />improvements to address increased traffic from Amazon and surrounding growth. The study will examine <br />st <br />20th Avenue from Birch Street to 80th Avenue, and the intersection of 21 Ave. and Main Street. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.