Laserfiche WebLink
Stantec City of Centerville Page 3 of 5 <br />1880 Main Street Client Project Number: <br />Payment Number: 1 <br />Centerville, MN 55038 <br />Quantity <br />AmountThis <br />Line <br />Description <br />Units <br />Unit Price <br />Contract <br />This <br />Quantity <br />Amount <br />Quantity <br />Request <br />Request <br />To Date <br />To Date <br />REMOVE AND REPLACE <br />16 <br />CATCH BASIN ADJUSTING <br />EA <br />$591.00 <br />55 <br />59 <br />$34,869.00 <br />59 <br />$34,869.00 <br />RINGS <br />17 <br />BITUMINOUS MATERIAL FOR <br />GAL <br />$3.50 <br />2150 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />TACK COAT <br />18 <br />BITUMINOUS OVERLAY WEAR <br />TN <br />$88.00 <br />2250 <br />825.36 <br />$72,631.68 <br />825.36 <br />$72,631.68 <br />COURSE SPWEA340B <br />BITUMINOUS NON -WEAR <br />19 <br />COURSE MIXTURE FOR <br />TN <br />$220.00 <br />60 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />PATCHING SPNWA330B <br />BITUMINOUS WEAR COURSE <br />20 <br />MIXTURE FOR DRIVEWAYS <br />TN <br />$150.00 <br />25 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />SPWEA340B <br />21 <br />6-INCHES THICK CONCRETE <br />SF <br />$16.00 <br />1000 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />DRIVEWAY <br />22 <br />CROSSWALK MARKING, <br />SF <br />$8.00 <br />160 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />EPDXY <br />23 <br />RESTORATION (TOPSOIL, <br />SY <br />$g 25 <br />300 <br />264 <br />$2,178.00 <br />264 <br />$2,178.00 <br />SEED WITH HYDROMULCH) <br />STREET SWEEPER WITH <br />24 <br />PICKUP BROOM AND <br />HR <br />$180.00 <br />30 <br />5 <br />$900.00 <br />5 <br />$900.00 <br />OPERATOR <br />25 <br />MOBILIZATION <br />LS <br />$10,000.00 <br />1 <br />0.7 <br />$7,000.00 <br />0.7 <br />$7,000.00 <br />26 <br />TRAFFIC CONTROL <br />LS <br />$900.00 <br />1 <br />0.7 <br />$630.00 <br />0.7 <br />$630.00 <br />27 <br />SILT FENCE, TYPE MACHINE <br />LF <br />$5.00 <br />100 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />SLICED <br />28 <br />BIOROLL <br />LF <br />$5.00 <br />60 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />29 <br />CLEARING AND GRUBBING <br />LS <br />$3,100.00 <br />1 <br />1 <br />$3,100.00 <br />1 <br />$3,100.00 <br />30 <br />SAWING BITUMINOUS <br />LF <br />$3.00 <br />120 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />PAVEMENT <br />31 <br />REMOVE AND REPLACE <br />LF <br />$61.00 <br />100 <br />56.1 <br />$3,422.10 <br />56.1 <br />$3,422.10 <br />CONCRETE CURB & GUTTER <br />32 <br />REMOVE CONCRETE CURB & <br />LF <br />$9.00 <br />300 <br />323 <br />$2,907.00 <br />323 <br />$2,907.00 <br />GUTTER (20' OR MORE) <br />33 <br />REMOVE CONCRETE WALK <br />SF <br />$4.00 <br />150 <br />150 <br />$600.00 <br />150 <br />$600.00 <br />34 <br />REMOVE BITUMINOUS <br />SY <br />$6.00 <br />3200 <br />3200 <br />$19,200.00 <br />3200 <br />$19,200.00 <br />PAVEMENT <br />35 <br />PRETREATMENT <br />EA <br />$3,370.00 <br />1 <br />1 <br />$3,370.00 <br />1 <br />$3,370.00 <br />STRUCTURE <br />36 <br />COMMON EXCAVATION - <br />CY <br />$27.00 <br />615 <br />567 <br />$15,309.00 <br />567 <br />$15,309.00 <br />PARKING LOT (P) <br />37 <br />CHANNEL EXCAVATION (P) <br />CY <br />$31.00 <br />85 <br />85 <br />$2,635.00 <br />85 <br />$2,635.00 <br />