Laserfiche WebLink
Stantec City of Centerville Page 4 of 5 <br />1880 Main Street Client Project Number: <br />Payment Number: 1 <br />Centerville, MN 55038 <br />Quantity <br />AmountThis <br />Line <br />Description <br />Units <br />Unit Price <br />Contract <br />This <br />Quantity <br />Amount <br />Quantity <br />Request <br />Request <br />To Date <br />To Date <br />38 <br />SEUBGRADE EXCAVATION <br />CY <br />$27.00 <br />100 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />39 <br />GEOTEXTILE FABRIC, TYPE V <br />SY <br />$2.50 <br />700 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />40 <br />AGGREGATE BASE, CLASS 5 <br />TN <br />$28.00 <br />375 <br />364.36 <br />$10,202.08 <br />364.36 <br />$10,202.08 <br />41 <br />SELECT GRANULAR <br />TN <br />$19.00 <br />900 <br />505 <br />$9,595.00 <br />505 <br />$9,595.00 <br />BORROW <br />42 <br />B612 CONCRETE CURB & <br />LF <br />$46.00 <br />250 <br />258 <br />$11,868.00 <br />258 <br />$11,868.00 <br />GUTTER <br />43 <br />DRAINTILE CLEANOUT <br />EA <br />$366.00 <br />2 <br />1 3 <br />$1,098.00 <br />3 <br />$1,098.00 <br />44 <br />6" PVC DRAINTILE <br />LF <br />$30.00 <br />270 <br />193 <br />$5,790.00 <br />193 <br />$5,790.00 <br />45 <br />CONCRETE PEDESTRIAN <br />SF <br />$21.00 <br />100 <br />84 <br />$1,764.00 <br />84 <br />$1,764.00 <br />CURB RAMP <br />46 <br />4-INCHES THICK CONCRETE <br />SF <br />$12.00 <br />320 <br />320 <br />$3,840.00 <br />320 <br />$3,840.00 <br />SIDEWALK <br />47 <br />TRUNCATED DOME SURFACE <br />SF <br />$68.00 <br />10 <br />1 9.6 <br />$652.80 <br />9.6 <br />$652.80 <br />48 <br />BITUMINOUS MATERIAL FOR <br />GAL <br />$3.50 <br />190 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />TACK COAT <br />49 <br />BITUMINOUS NON WEARING <br />TN <br />$90.00 <br />420 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />COURSE SPNWA330B <br />50 <br />BITUMINOUS WEARING <br />TN <br />$90.00 <br />320 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />COURSE SPWEA340B <br />51 <br />RIPRAP, CLASS 3 <br />CY <br />$90.00 <br />10 <br />10 <br />$900.00 <br />10 <br />$900.00 <br />52 <br />TOPSOIL BORROW (LV) <br />CY <br />$77.00 <br />50 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />53 <br />SEED MIX 25-151 WITH <br />SY <br />$5.00 <br />100 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />HYDROMULCH <br />SEED MIX 33-261 WITH <br />54 <br />EROSION CONTROL <br />SY <br />$5.00 <br />150 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />BLANKET <br />55 <br />SOD <br />SY <br />$21.00 <br />40 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />56 <br />PAVEMENT MARKING, EPDXY <br />EA <br />$130.00 <br />3 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />ADA SYMBOL <br />57 <br />4" SOLID LINE WHITE, EPDXY <br />LF <br />$3.25 <br />1100 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />STREET SWEEPER WITH <br />58 <br />PICKUP BROOM AND <br />HR <br />$180.00 <br />10 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />OPERATOR <br />Base Bid Totals: <br />$450,093.66 <br />$450,093.66 <br />