Laserfiche WebLink
Stantec <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038 <br />Page 5 of 5 <br />Client Project Number: <br />Payment Number: 1 <br />Project Category Totals <br />Project <br />Category <br />Amount This Request <br />Amount To Date <br />193805625 <br />PART A: THIN BITUMINOUS <br />OVERLAY <br />$346,210.68 <br />$346,210.68 <br />193805625 <br />PART B: CITY HALL <br />PARKING LOT <br />$103,882.98 <br />$103,882.98 <br />Contract <br />Change Item Status <br />Quantity <br />Amount <br />CC <br />CC# <br />Line <br />Item <br />Description <br />p <br />Units <br />Unit <br />Contract <br />This <br />This <br />Quantity <br />Amount <br />Price <br />Quantity <br />Request <br />Request <br />To Date <br />To Date <br />CO <br />1 <br />59 <br />20501 <br />COMMOATION <br />CY <br />27.00 <br />8 <br />2 <br />54.00 <br />2 <br />54.00 <br />C <br />1 <br />60 <br />2211.509 <br />AGGREGATE BASE <br />TN <br />28.00 <br />10 <br />4.5 <br />126.00 <br />4.5 <br />126.00 <br />O <br />CLASS 5 <br />C <br />1 <br />61 <br />2521.518 <br />4" CONCRETE WALK <br />SF <br />12.00 <br />216 <br />185 <br />2,220.00 <br />185 <br />2,220.00 <br />O <br />CO <br />1 <br />62 <br />9990.6434 <br />RESTORATION <br />SY <br />5.00 <br />50 <br />0 <br />0.00 <br />0 <br />0.00 <br />CO <br />1 <br />63 <br />2105.607 <br />COMMOATION <br />CY <br />27.00 <br />105 <br />0 <br />0.00 <br />0 <br />0.00 <br />(EV) <br />C <br />1 <br />64 <br />2108.504 <br />GEOTEXTILE FABRIC <br />SY <br />3.50 <br />315 <br />0 <br />0.00 <br />0 <br />0.00 <br />O <br />TYPE 5 <br />C <br />1 <br />65 <br />2211.509 <br />AGGREGATE BASE <br />TN <br />28.00 <br />115 <br />0 <br />0.00 <br />0 <br />0.00 <br />O <br />CLASS 5 <br />CO <br />1 <br />66 <br />9990.6434 <br />RESTORATION <br />SY <br />5.00 <br />780 <br />0 <br />0.00 <br />0 <br />0.00 <br />CO <br />PAVEMENT MESSAGE, <br />1 <br />67 <br />4990.2473 <br />LEFT TURN ARROW - <br />EA <br />135.00 <br />1 <br />0 <br />0.00 <br />0 <br />0.00 <br />EPDXY <br />PAVEMENT MESSAGE <br />C <br />LO <br />1 <br />68 <br />2760.0104 <br />(LEFT-THRU ARROW) <br />EA <br />204.00 <br />1 <br />0 <br />0.00 <br />0 <br />0.00 <br />EPDXY <br />Contract Change Totals: <br />$2,400.00 <br />$2,400.00 <br />Contract Total 1$452,493.66 <br />Contract Chan <br />a Totals <br />Number <br />Description <br />Amount This <br />Amount To Date <br />Request <br />1 <br />Part A: Construction of concrete walk between the City Hall main entrance <br />2,400.00 <br />2,400.00 <br />and Fire Station door <br />Part B: Excavation and construction of gravel base for proposed trail <br />between Old Mill Court and Laramee Lane <br />Part C: Installation of turn lane arrows on Centerville Road north of Main <br />Street (CSAH 14) <br />