My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-11-09 Administrator's Report
Centerville
>
City Council
>
City Administrator Weekly Updates
>
2018-2022
>
2022
>
2022-11-09 Administrator's Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2022 5:45:05 AM
Creation date
12/9/2022 5:44:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the north side of the facility and will continue to work on minor clean-up items. <br /> <br />(1) Bay View Villas (Waterworks Site) <br />The developer’s landscaping crew has finished sod work near the cul-de-sac and has just a few items <br />from the punch list remaining. <br /> <br />(8) Atlas Villas Memory Care Project (1825 Main Street) <br />Details for a late November open house are being finalized. <br /> <br />(10-14) Rehbein Commercial <br />thst <br />The sidewalk on the north side of Main Street, between 20 Avenue and 21 Avenue will be graded in <br />the coming weeks and if weather permits, the concrete will be poured. Other punch list items remain. <br /> <br />(13) Kwik Trip <br />Construction on the building and site continues. Concrete pavement installation is in full swing now that <br />th <br />the turn lane on Main Street is complete. The store anticipates opening on December 29. <br /> <br />(11) Norbella Senior <br />Living <br />Norbella is hosting a <br />Fall Open House on <br />Thursday, November <br />17 from 1:00PM – <br />4:00PM. <br /> <br />The image shown on <br />the left is an except <br />from the flyer <br />promoting the open <br />house. <br /> <br />Call 651-410-2201 to <br />RSVP! <br /> <br /> <br /> <br />(2) Peterson Shores <br />Staff met with a prospective builder on site to discuss sewer and water connections as well as grading and <br />driveway issues. <br /> <br />(17, 19) Rehbein Industrial <br />rd <br />Paving of the wear course was completed on October 3 and the road is fully open to traffic. A few minor <br />punch list items remain, before the project can be completed. <br /> <br />(19) Sutton Transport <br />The 50,000 square foot trucking and warehousing facility is now fully operational with a few dozen <br />employees reporting to work there each day. Welcome to Centerville! <br /> <br />(15) 2050/2070 Main Street – American Roofing Supply <br />The rehabilitation of the once-vacant, 40,000 sf building on Main Street is not complete and American <br />Roofing Supply is up and fully operational. Welcome to Centerville! <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.