My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-08 Administrator Report
Centerville
>
City Council
>
City Administrator Weekly Updates
>
2023
>
2023-03-08 Administrator Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2023 7:34:31 AM
Creation date
3/6/2023 7:34:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vendors on hand will be: Republic Services, Evergreen Recycling, East Side Oil Company and RandyÓs <br />Shredding. <br />COMMUNITY DEVELOPMENT <br />Project Map <br />Staff has prepared a map of all active developments to help everyone get a better picture of whatÓs <br />happening around our community. The number you see at the heading of each item in this section <br />corresponds to a number on the map, which is attached to the end of this report. <br />(11) Norbella Senior Living <br />The Norbella Senior Living facility erected a new sign to cap off their first-class development. The rooms are <br />42% full and their operation is fully staffed. <br />(9) Block 7 Property (Downtown) <br />The city approved a purchase agreement with a developer (Schifsky Companies) who continues to explore the <br />viability of the site for a townhome style development. City staff recently met with Mr. Schifsky to look at <br />ways to more efficiently engineer the siteÓs stormwater infrastructure. <br />stnd <br />(3)(4) Old Mill Estates 1 and 2 Additions <br />The developer has finished black dirt and seed work in boulevards and around ponds. They continue to <br />work to finalize wetland and other watershed permits. <br />Construction of the gravel base for the trail between Old Mill Court and Laramee Lane is now complete. <br />Concrete work will be completed in the spring to ensure the base has a chance to settle over the winter. <br />(16) Centerville Storage <br />The facility is now open for business. The developer has made progress to address drainage issues along the <br />north side of the facility and will continue to work on minor clean-up items. <br />(1) Bay View Villas (Waterworks Site) <br />The developerÓs landscaping crew has finished sod work near the cul-de-sac and has just a few items from <br />the punch list remaining. <br />(10-14) Rehbein Commercial <br />thst <br />The sidewalk on the north side of Main Street, between 20 Avenue and 21 Avenue will be graded and <br />poured in the spring. Other punch list items remain. Record plans have been submitted and reviewed. <br />(13) Kwik Trip <br />Construction is complete with the exception of some punch list items and the sidewalk along Main Street, in <br />the spring. The store is now open! <br />(17, 19) Rehbein Industrial <br />Record Plans for the project have been submitted and reviewed. Once permit closure is achieved, the project <br />can be closed out. <br />(18) Max Storage (Fairview Street) <br />A building permit has now been issued for construction of Building #1 of 2. The developers have decided to <br />wait until spring to begin construction. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.