My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-25 Administrator Report
Centerville
>
City Council
>
City Administrator Weekly Updates
>
2023
>
2023-01-25 Administrator Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2023 7:44:05 AM
Creation date
3/6/2023 7:44:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(1) BayViewVillas(WaterworksSite) <br />The developer’s landscaping crew has finished sod worknear the cul-de-sac and has just a few items from <br />the punch list remaining. <br />(8) AtlasVillasMemoryCareProject (1825 MainStreet) <br />Atlas Villas is hosting open houses on January <br />7th, January 14th, and January 21st. Tours <br />will be given at each of these events. Atlas is <br />expecting to have residents on February 1st. <br />Atlas is also hiring. You can learn more at <br />atlasvillasmemorycare.comor scan the QR <br />code below. <br />(10-14) RehbeinCommercial <br />thst <br />The sidewalk on the north side of Main Street, between 20 Avenue and 21 Avenue will be graded and <br />poured in the spring. Other punch list items remain. Record plans have been submitted and reviewed. <br />(13) KwikTrip <br />Construction is complete with the exception of some punch list items and the sidewalk along Main Street, <br />in the spring. The store is now open! <br />(2) PetersonShores <br />Staff met with a prospective builder on site to discuss sewer and water connections as well as grading and <br />driveway issues. <br />(17, 19) RehbeinIndustrial <br />Record Plans for the project have been submitted and reviewed. Once permit closure is achieved, the project <br />can be closed out. <br />(18) Max Storage (FairviewStreet) <br />A building permit has now been issued for construction of Building #1 of 2. The developers have decided <br />to wait until spring to begin construction. <br />(17) AmazonFulfillmentCenter <br />The building shell is now up and work on the van loading area canopy has begun. Site work will continue <br />in the spring. Interior work on the building continues. <br />A secondmeeting for the Corridor Study was held onDecember 12.Stakeholders heardfrom the consultant <br />on their initial data gathering and analysis. Next steps will be developed, looking at intersection evaluations <br />and other more specific corridor issues.The study will prioritize area-wide transportation improvements to <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.