My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-26 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
2023
>
2023-04-26 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2023 2:10:22 PM
Creation date
4/24/2023 2:10:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTENNIAL FIRE DISTRICT <br />We’re hiring! Click here for more info, or to apply: https://www.centennialfire.org/services-2 <br />COMMUNITY DEVELOPMENT <br />Project Map <br />Staff has prepared a map of all active developments to help everyone get a better picture of what’s <br />happening around our community. The number you see at the heading of each item in this section <br />corresponds to a number on the map, which is attached to the end of this report. <br /> <br />(9) Block 7 Property (Downtown) <br />The city’s purchase agreement with Schifsky Companies for the development of Block 7 has now expired <br />after the developer was unable to make the numbers work for their project. City Staff has already been <br />contacted by another builder and is exploring concepts for development that may fit their product line. <br /> <br />stnd <br />(3)(4) Old Mill Estates 1 and 2 Additions <br />The developer recently shared an update from their contractor who plans to complete their remaining <br />punch list items in early May. Other development-wide punch list items remain for the developer to <br />complete. <br /> <br />Construction of the gravel base for the trail between Old Mill Court and Laramee Lane is now complete. <br />Concrete work will be completed in the spring to ensure the base has a chance to settle over the winter. <br /> <br />(16) Centerville Storage <br />The facility is now open for business. The developer has made progress to address drainage issues along <br />the north side of the facility and will continue to work on minor clean-up items. <br /> <br />(1) Bay View Villas (Waterworks Site) <br />The developer’s landscaping crew has finished sod work near the cul-de-sac and has just a few items from <br />the punch list remaining. <br /> <br />(10-14) Rehbein Commercial <br />thst <br />The sidewalk on the north side of Main Street, between 20 Avenue and 21 Avenue will be graded and <br />poured in the spring. Other punch list items remain. Record plans have been submitted and reviewed. <br /> <br />(13) Kwik Trip <br />Construction is complete with the exception of some punch list items and the sidewalk along Main Street, <br />in the spring. The store is now open! <br />(17, 19) RehbeinIndustrial <br />Record Plans for the project have been submitted and reviewed. Once permit closure is achieved, the project <br />can be closed out. <br /> <br />(18) MaxStorage (FairviewStreet) <br />A building permit has now been issued for construction of Building #1 of 2. The developers have decided <br />to wait until spring to begin construction. <br /> <br />(17) Amazon Fulfillment Center <br />Roofing and interior work continue as progress on the building has been steady. Exterior lighting, including <br />both on-building lights and parking lot lights have been completed and are now on during the night. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.